5110 Manor Rd

Austin, TX 78723

Austin Peace Academy site-plan case is awaiting legal review

The latest record for 5110 Manor Road is a site-plan case tied to Austin Peace Academy, filed Oct. 26, 2026, and listed as waiting on legal review. The records do not specify what construction is proposed; 2025 permits cover plumbing work at an existing occupied education facility.

Summarized from City of Austin records · updated Nov 18, 2026

Projects
9
9 filings
Latest filing
Nov 18, 2026
since Nov 18, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Gas pressure test the gas pressure test for 5110 manor road is a requirement of the city every two years. this is according to our contact at the property. needs to have a gas pressure test done to verify no leaks are present. it is on the middle building and the meter is in the back

  1. AppliedAug 4, 2025
  2. IssuedAug 6, 2025
  3. WorkAug '25 – Aug '25
  4. Final inspectionAug 7, 2025

Passed final inspection Aug 7, 2025.

1 contact on this project · 1 phone number

Permit & project history

9 projects
  1. Austin Peace Academy (W/R SP-2023-0493C)

    Austin peace academy (with r sp-2023-0493c)

    City of Austin casesite_planApproved and Released
    Record
    13469790
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Gas pressure test the gas pressure test for 5110 manor road is a requirement of the city every two years. this is according to our contact at the property. needs to have a gas pressure test done to verify no leaks are present. it is on the middle building and the meter is in the back

    Gas pressure test the gas pressure test for 5110 manor road is a requirement of the city every two years. this is according to our contact at the property. needs to have a gas pressure test done to verify no leaks are present. it is on the middle building and the meter is in the back

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replace low hazard backflow preventer installed by others with high hazard backflow preventer label or paint any visible auxiliary water components provide for thermal expansion conduct cross connection test. this is an existing occupied education facility and is a health and safety hazard to the public water system and needs immediate attention please

    Replace low hazard backflow preventer installed by others with high hazard backflow preventer label or paint any visible auxiliary water components provide for thermal expansion conduct cross connection test. this is an existing occupied education facility and is a health and safety hazard to the public water system and needs immediate attention please

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Austin Peace Academy

    Austin peace academy

    City of Austin casesite_planWithdrawn
    Record
    13243569
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Resubdivision of Lot 1, Uptown Business Park, Section 1

    Resubdivision of lot 1, uptown business park, section 1

    City of Austin casesubdivisionSubdivision Recorded
    Record
    11682717
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Austin Peace Academy

    Austin peace academy

    City of Austin casesite_planWithdrawn
    Record
    11489456
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Uptown Business Park, Section 1; Resubdivision of Lot 1

    Uptown business park, section 1; resubdivision of lot 1

    City of Austin casesubdivisionExpired
    Record
    11464583
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. ISLAMIC CENTER OF GREATER AUSTIN

    Islamic center of greater austin

    City of Austin casesite_planApproved and Released
    Record
    202594
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. ISLAMIC CENTER OF GREATER AUSTIN

    Islamic center of greater austin

    City of Austin casesite_planApproved and Released
    Record
    154920
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5110 Manor Rd

What is being built at 5110 Manor Road?

The latest record is a site-plan case tied to Austin Peace Academy, not a description of a confirmed building project. Filed Oct. 26, 2026, case 13469790 is listed as waiting on legal review.

Is Austin Peace Academy expanding at 5110 Manor Road?

The records do not confirm an expansion. The latest site-plan case, 13469790, was filed Oct. 26, 2026, and is waiting on legal review.

What is the status of the Austin Peace Academy site plan?

The City of Austin lists case 13469790, filed Oct. 26, 2026, as waiting on legal review. An earlier Austin Peace Academy site-plan case filed Feb. 14, 2025, was withdrawn.

What work was permitted at 5110 Manor Road in 2025?

Permit 2025-024351 PP, issued Feb. 28, 2025, covered replacement of a backflow preventer and related cross-connection work. Permit 2025-097590 PP, issued Aug. 6, 2025, covered a gas pressure test.

Is 5110 Manor Road an existing school?

A Feb. 28, 2025, plumbing permit describes the property as an existing occupied education facility. City records also identify site-plan cases tied to Austin Peace Academy at this address.

Has construction been approved at 5110 Manor Road?

The latest site-plan case, 13469790, is listed as waiting on legal review, so the record does not show that this case has been approved. A separate site-plan case for the Islamic Center of Greater Austin was approved and released in 2007.