5206 Robinsdale Ln
Austin, TX 78723
5206 Robinsdale Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 5206 Robinsdale Ln, Austin, TX 78723. The most recent, filed October 9, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Oct 9, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 9, 2024
- since Oct 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedOct 4, 2024
- IssuedOct 9, 2024
- WorkOct '24 – Oct '24
- Final inspectionOct 15, 2024
Passed final inspection Oct 15, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-134597 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5206 Robinsdale Ln
What is being built at 5206 Robinsdale Ln?
The latest filing (City of Austin permit 2024-134597 PP, October 9, 2024) covers replacement of an existing water heater.
How many permits and filings does 5206 Robinsdale Ln have?
1 filing across 1 project, from October 9, 2024 to October 9, 2024.
Is there other construction near 5206 Robinsdale Ln?
Yes. Nearby filings include 5204 Robinsdale Ln (25 tunnel under home to repair a separated main line, May 4, 2026); 5301 Peacedale Ln (replacement of complete existing central heat and air system with or without duct work 1 system: 2 ton 14 seer2 single stage condenser evaporator coil and gas furnace, Sep 8, 2026); 5309 Peacedale Ln (* excavation of soil to expose the damaged section of pipe. approximately 10.0. * removal and replacement of the damaged section of pipe. laid onto a bed of sand at specified grade. * backfill of the trench, Sep 4, 2024).
How do I get alerts for new permits at 5206 Robinsdale Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5204 Robinsdale LnMay 4, 202625 tunnel under home to repair a separated main line · 23 m away
- 5301 Peacedale LnSep 8, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 2 ton 14 seer2 single stage condenser evaporator coil and gas furnace · 62 m away
- 5309 Peacedale LnSep 4, 2024* excavation of soil to expose the damaged section of pipe. approximately 10.0. * removal and replacement of the damaged section of pipe. laid onto a bed of sand at specified grade. * backfill of the trench · 70 m away
- 5311 Peacedale LnNov 26, 2025Express: 1690 sq ft decking removal and replacement · 85 m away
- 5106 Brookdale LnApr 21, 2025Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 5202 Waterbrook DrNov 12, 2026Addition of primary suite dining room garage conversion and patio to the rear of the existing home including full interior remodel and addition of 3rd full bath · 106 m away
- 5306 Peacedale LnApr 11, 2024Demolition old driveway. construct new driveway approaches of 12 ft curb & gutter of 40 ft.sfil paid ***no sidewalk inspection per bp · 108 m away
- 5200 Waterbrook DrAug 25, 2025Replace full service loop including meter riser & panel. sub panel. adding new sub panel feeder · 113 m away
- 5202 Brookdale LnOct 16, 2025Tunnel under home in backyard and front yard approximately 40feet in the house to make a sewer repairs · 120 m away
- 5315 Peacedale LnApr 4, 2025Upgrade electrical main service panel from 100 amp to a 200 amp service · 124 m away
- 5304 Robinsdale LnNov 25, 2024Replacement of complete existing central heat and air system with or without duct work mechanical hvac change-out; like for like; 2.5 ton horizontal split gas · 130 m away
- 5303 Robinsdale LnFeb 5, 2025Express foundation repair revision: replacement of drain lines to pvc water supply & gas lines upgrade of electrical panel and complete rewire of house upgrade hvac-new condenser & furnace · 132 m away