5308 E Martin Luther King Jr Blvd
Austin, TX 78723
5308 E Martin Luther King Jr Blvd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 5308 E Martin Luther King Jr Blvd, Austin, TX 78723. The most recent, filed November 15, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Nov 15, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 15, 2024
- since Nov 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 5, 2024
- IssuedNov 15, 2024
- !WorkNov '24 – May '25
- Final inspection
Marked expired May 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-147774 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
We repaired the wire in the hallway installed a new light and ceiling fan in living room
We repaired the wire in the hallway installed a new light and ceiling fan in living room
City of Austin permitElectrical PermitFinal- Record
- 2023-075559 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5308 E Martin Luther King Jr Blvd
What is being built at 5308 E Martin Luther King Jr Blvd?
The latest filing (City of Austin permit 2024-147774 MP, November 15, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 5308 E Martin Luther King Jr Blvd have?
2 filings across 2 projects, from November 15, 2024 to November 15, 2024.
Is there other construction near 5308 E Martin Luther King Jr Blvd?
Yes. Nearby filings include 4707 Oldfort Hill Dr (40 tunnel below the foundation to replace entire drain system. 2 access holes - front back, Apr 7, 2026); 4713 Oldfort Hill Dr (replacement of complete existing central heat and air system with or without duct work, Apr 9, 2025); 4710 Oldfort Hill Dr (express: replace 9 existing windows size for size, Oct 24, 2025).
How do I get alerts for new permits at 5308 E Martin Luther King Jr Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 4707 Oldfort Hill DrApr 7, 202640 tunnel below the foundation to replace entire drain system. 2 access holes - front back · 43 m away
- 4713 Oldfort Hill DrApr 9, 2025Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 4710 Oldfort Hill DrOct 24, 2025Express: replace 9 existing windows size for size · 99 m away
- 5214 E Martin Luther King Jr BlvdJun 5, 2025Emergency replaced all damaged overhead materials ***storm related-emergency inspection done on 6/1/25. espa is required-hyatt · 109 m away
- 4700 York Hill DrApr 27, 2026Emergency repair meter can and main panel had to be replaced · 124 m away
- 4714 Oldfort Hill DrApr 22, 2024Tunnel from exterior approx 30ft to replumb up to bottom of foundation 2 full bathrooms kitchen and laundry sink drain line up to exterior cleanout · 131 m away
- 4801 Oldfort Hill DrApr 19, 2024Cast iron replacement under slab · 137 m away
- 4707 Broadhill DrMar 12, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 2 ton ac system and removal and replacement of flexible return air ducting · 141 m away
- 4601 Broadhill DrApr 20, 2026The property experienced damage due storms in the area. the meter can and overhead riser were ripped out of the structure. we plan to replace meter & riser conduit only. existing main service panel to remain as is. our goal is to restore power to customer as soon as possible · 153 m away
- 4803 Oldfort Hill DrOct 5, 2026Tunnel - replace all sewer lines under home tunneling roughly 80 ft. once all sewer lines are exposed we will cut out the old cast iron and install new pvc piping anchored to the foundation for proper grade up to each fixture in the home. tested for leaks and proper function after permit inspection and engineer report are performed we will backfill the tunnel · 158 m away
- 4711 Russet Hill DrFeb 18, 2026New sewer system at 4711 russet hill drive · 159 m away
- 4800 Oldfort Hill DrDec 6, 2023Replacement of complete existing central heat and air system with or without duct work · 163 m away