5419 N IH 35 Svrd Nb
Austin, TX 78723
Sewer line repairs and cleanouts permitted on N IH 35
A sewer line repair and cleanout installation was permitted at 5419 N IH 35 Svrd Nb in Austin on November 22, 2023. The permit describes about 140 linear feet of asphalt to be sawcut, with paving by others; it is listed as final.
Summarized from City of Austin records · updated Nov 22, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 22, 2023
- since Nov 22, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer line work for repair and installing cleanouts. approx 140 l.f. asphalt will need to be sawcut. (paving by others.)
- AppliedNov 20, 2023
- IssuedNov 22, 2023
- WorkNov '23 – Jun '24
- Final inspectionJun 28, 2024
Passed final inspection Jun 28, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer line work for repair and installing cleanouts. approx 140 l.f. asphalt will need to be sawcut. (paving by others.)
Sewer line work for repair and installing cleanouts. approx 140 l.f. asphalt will need to be sawcut. (paving by others.)
City of Austin permitPlumbing PermitFinal- Record
- 2023-149889 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5419 N IH 35 Svrd Nb
What work was permitted at 5419 N IH 35 Svrd Nb?
A City of Austin plumbing permit covers sewer line repairs and installation of cleanouts. The description notes about 140 linear feet of asphalt would need to be sawcut.
When was the sewer work permitted?
The permit was filed on November 22, 2023. Permit number: 2023-149889 PP.
Is a new building being built at 5419 N IH 35 Svrd Nb?
The record describes sewer line repair and cleanout work, not construction of a new building.
What does the permit say about paving?
It says about 140 linear feet of asphalt would be sawcut and that paving would be by others.
What work was permitted near Capital-Highway 35?
At 5419 N IH 35 Svrd Nb, about 12 meters from the listed Capital-Highway 35 landmark, a sewer line repair and cleanout installation was permitted in November 2023.
Also being built nearby
All of 78723- 5501 N. Interstate 35 Frontage Rd · Capital-Highway 35 Ltd.Nov 11, 2025Milano nail spa — renovation/alteration — interior build out approx 11650 s.f. nail spa · 12 m away
- 5365 N IH 35 Svrd NbJun 25, 2024Replacement of any self-contained packaged units · 55 m away
- 5361 N IH 35 Svrd NbSep 21, 2026Replacement of an existing water heater · 65 m away
- 5407 N IH 35 Svrd NbApr 10, 2025Install a double faced illuminated pylon · 74 m away
- 5431 N IH 35 Svrd NbMay 27, 2025Burlington/ sign c: cl sets · 83 m away
- 5355 IH 35 SvrdNov 6, 20265355 n ih 35 service road · 89 m away
- 5431 N. Interstate 35 · Weitzman Property ManagerFeb 10, 2025Burlington — renovation/alteration — renovation/demising of 40,000 sq ft space into two spaces. one for burlington at 28,607 sq ft and the remainder for a future tenant space · 119 m away
- 5345 IH 35 SvrdNov 19, 2007Walgreens- capital plaza · 138 m away
- 5411 Harmon AveJan 24, 2024Replacement of an existing water heater · 163 m away
- 5405 N IH 35 Svrd NbMar 6, 2025Foot locker wall sign · 181 m away
- 5405 Harmon AveNov 14, 2024Rebuild 100 amp single phase overhead service that was destroyed by a tree limb · 184 m away
- 5660 N IH 35 Svrd SbMar 8, 2024Interior remodel to existing hotel level 6 · 187 m away