Coventry Lane home remodel adds a second full bathroom

A permitted interior remodel at 5800 Coventry Ln will convert one full bathroom and one half-bath into two full bathrooms. The building permit was filed June 30, 2025, followed by a plumbing permit on September 2 and an electrical permit on September 22.

Summarized from City of Austin records · updated Sep 22, 2025

Projects
3
3 filings
Latest filing
Sep 22, 2025
since Jun 30, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new sub panel. wire two (2) water heaters. install one (1) laundry circuit. repair miscellaneous existing circuits as needed. relocate gfci in master bedroom. add one (1) new receptacle and one (1) light fixture in master bathroom. install one (1) sconce light fixture. provide a dedicated circuit for septic pump located in the utility room

  1. AppliedMay 7, 2025
  2. IssuedSep 22, 2025
  3. WorkSep '25 – Dec '25
  4. Final inspectionDec 16, 2025

Passed final inspection Dec 16, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Install new sub panel. wire two (2) water heaters. install one (1) laundry circuit. repair miscellaneous existing circuits as needed. relocate gfci in master bedroom. add one (1) new receptacle and one (1) light fixture in master bathroom. install one (1) sconce light fixture. provide a dedicated circuit for septic pump located in the utility room

    Install new sub panel. wire two (2) water heaters. install one (1) laundry circuit. repair miscellaneous existing circuits as needed. relocate gfci in master bedroom. add one (1) new receptacle and one (1) light fixture in master bathroom. install one (1) sconce light fixture. provide a dedicated circuit for septic pump located in the utility room

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Interior remodel - 1 full bathroom and 1 half bath - turning into 2 full bathrooms by adding tub 1/2 bath. primary full bath: remove existing tile from walls floors and tub surround tub vanity; saving existing toilet and existing corner cabinet. guest half bath: remove existing tile from walls floor cabinet vanity sink; saving existing toilet. primary bath: install glass fronted walk-in shower in lieu of tub reset toilet reuse existing cabinet install new sink and vanity. guest: add drain install new tub tile surround and pedestal sink; reset toilet

    Interior remodel - 1 full bathroom and 1 half bath - turning into 2 full bathrooms by adding tub 1/2 bath. primary full bath: remove existing tile from walls floors and tub surround tub vanity; saving existing toilet and existing corner cabinet. guest half bath: remove existing tile from walls floor cabinet vanity sink; saving existing toilet. primary bath: install glass fronted walk-in shower in lieu of tub reset toilet reuse existing cabinet install new sink and vanity. guest: add drain install new tub tile surround and pedestal sink; reset toilet

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Interior remodel - 1 full bathroom and 1 half bath - turning into 2 full bathrooms by adding tub 1/2 bath. primary full bath: remove existing tile from walls floors and tub surround tub vanity; saving existing toilet and existing corner cabinet. guest half bath: remove existing tile from walls floor cabinet vanity sink; saving existing toilet. primary bath: install glass fronted walk-in shower in lieu of tub reset toilet reuse existing cabinet install new sink and vanity. guest: add drain install new tub tile surround and pedestal sink; reset toilet

    Interior remodel - 1 full bathroom and 1 half bath - turning into 2 full bathrooms by adding tub 1/2 bath. primary full bath: remove existing tile from walls floors and tub surround tub vanity; saving existing toilet and existing corner cabinet. guest half bath: remove existing tile from walls floor cabinet vanity sink; saving existing toilet. primary bath: install glass fronted walk-in shower in lieu of tub reset toilet reuse existing cabinet install new sink and vanity. guest: add drain install new tub tile surround and pedestal sink; reset toilet

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5800 Coventry Ln

What is being remodeled at 5800 Coventry Lane in Austin?

The permits describe an interior remodel that converts a full bathroom and a half-bath into two full bathrooms. The building permit is 2025-065495 BP.

Is a new bathroom being added at 5800 Coventry Ln?

Yes. The plans add a tub to the half-bath, making it a second full bathroom. The building permit was filed June 30, 2025.

What changes are planned for the primary bathroom at 5800 Coventry?

The permit describes replacing the tub with a glass-fronted walk-in shower, installing a new sink and vanity, and reusing the existing toilet and cabinet.

What work is planned for the guest bathroom at 5800 Coventry Ln?

The half-bath is to receive a tub, tile surround, and pedestal sink, with the existing toilet reset. The plumbing permit, 2025-065495 PP, was filed September 2, 2025.

What electrical work is permitted at 5800 Coventry Lane?

Permit 2025-114785 EP covers a new subpanel, circuits for two water heaters and laundry, miscellaneous circuit repairs, and other electrical work. It was filed September 22, 2025.