5800 North Hampton Dr
Austin, TX 78723
Water heater and HVAC replacements at 5800 North Hampton Dr
City of Austin permits indicate replacement work at the existing residence, not a new building. A mechanical permit for the central heat and air system was filed September 20, 2024, and a plumbing permit for a 40-gallon gas water heater in the garage was filed August 4, 2026.
Summarized from City of Austin records · updated Aug 4, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 4, 2026
- since Sep 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater replacement of 40g gas water heater in the garage
- AppliedAug 3, 2026
- IssuedAug 4, 2026
- WorkAug '26 – Aug '26
- Final inspectionAug 10, 2026
Passed final inspection Aug 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of an existing water heater replacement of 40g gas water heater in the garage
Replacement of an existing water heater replacement of 40g gas water heater in the garage
City of Austin permitPlumbing PermitFinal- Record
- 2026-099892 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-124043 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5800 North Hampton Dr
What is being built at 5800 North Hampton Dr?
The records show replacement work at an existing residence: a central heat and air system and a garage water heater. They do not show a new building.
What work was permitted at 5800 North Hampton Dr in 2026?
A City of Austin plumbing permit, 2026-099892 PP, was filed August 4, 2026, for replacement of a 40-gallon gas water heater in the garage. Its status is Final.
Was the HVAC system replaced at 5800 North Hampton Dr?
A City of Austin mechanical permit, 2024-124043 MP, describes replacement of the existing central heat and air system, with or without duct work. It was filed September 20, 2024, and its status is Final.
When were permits filed for work at 5800 North Hampton Dr?
The mechanical permit was filed September 20, 2024, and the plumbing permit was filed August 4, 2026.
Is a new home being built at 5800 North Hampton Dr?
The two City of Austin records describe replacement of existing mechanical and plumbing equipment. They do not indicate new home construction.
Also being built nearby
All of 78723- 5806 North Hampton DrMar 3, 2026Express: 3000 sq ft decking removal and replacement · 6 m away
- 5903 North Hampton DrSep 16, 20264 tunnel to repair broken pipe. access located in front of house by cleanout · 26 m away
- 2203 Lockwood CvOct 24, 2025Install a 60 amp 240v circuit in the 200-amp main panel using an available breaker slot. the proposed wire route is to run the wiring through surface mounted conduit from the main panel along the exterior wall enter the garage and install the nema 14-50 on the interior garage back wall · 57 m away
- 5801 Thames DrMay 24, 2024Interior remodel · 64 m away
- 5711 Thames DrDec 4, 2023Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 2202 Lockwood CvMay 8, 2025Replacement of complete existing central heat and air system with or without duct work hallway closet · 70 m away
- 2103 Thames CirNov 3, 2024Temp power ref. 2024-086849 bp · 77 m away
- 5707 Thames DrAug 28, 2026Replacement of complete existing central heat and air system with or without duct work 5707 thames drive · 90 m away
- 5803 North Hampton DrSep 2, 202650 trench to replace yard sewer · 98 m away
- 2104 Thames CirApr 16, 2026Upgrade 200a electrical service · 116 m away
- 5800 Thames DrJul 23, 2026Tunnel approximately 30 feet and replace the underfloor cast iron waste piping for the two bathrooms with new pvc piping. we will also run the kitchen sink and washer waste piping thru the wall to the outside. from there we will excavate across the back yard to the rear bathroom and connect to the new piping. if needed for proper slope we will run the waste piping to the city cleanout at the easement. we will also replace the water yard line · 128 m away
- 2201 Langford CvOct 14, 2025Due to solar auxiliary failing inspection for clearance issues main panel size and meter pan issues. we are upgrading meter can main panel and relocating them to a safe location with sufficient clearance from the deck · 128 m away