groundranger
Recent · latest filing May 2026Residential

5905 Belfast Dr

Austin, TX 78723

Electrical service upgrade and drain reroute at 5905 Belfast Dr

Permits at 5905 Belfast Dr record residential electrical and plumbing work, not a new building. A plumbing permit filed April 3, 2024, covers rerouting the drain system outside the foundation, and an electrical permit filed May 26, 2026, covers upgrading the service to 200 amps.

Summarized from City of Austin records · updated May 26, 2026

Projects
2
2 filings
Latest filing
May 26, 2026
since Apr 3, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Upgrade 125a service to200 amp service and 200 amp meter upgrade

  1. AppliedMay 18, 2026
  2. IssuedMay 26, 2026
  3. WorkMay '26 – Dec '26
  4. Final inspection
84% through of the permit windowMay 26, 2026 → Dec 22, 2026

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Upgrade 125a service to200 amp service and 200 amp meter upgrade

    Upgrade 125a service to200 amp service and 200 amp meter upgrade

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Abandon the existing cast iron drain system under the foundation tunnel for access & reroute the drain system to the exterior

    Abandon the existing cast iron drain system under the foundation tunnel for access & reroute the drain system to the exterior

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5905 Belfast Dr

What work is permitted at 5905 Belfast Dr in Austin?

City of Austin permits record a drain-system reroute and an electrical service upgrade at the residence.

Is a new home being built at 5905 Belfast Dr?

The available records describe plumbing and electrical work at a residence, not construction of a new home.

What does the plumbing permit at 5905 Belfast Dr cover?

Permit 2024-039031 PP, filed April 3, 2024, covers abandoning the existing cast-iron drain system under the foundation and rerouting the drain system to the exterior. Its status is Final.

What electrical work is planned at 5905 Belfast Dr?

Permit 2026-062699 EP, filed May 26, 2026, covers upgrading the electrical service from 125 amps to 200 amps and upgrading the meter. The permit status is Active.

When were permits filed for 5905 Belfast Dr?

The plumbing permit was filed April 3, 2024, and the electrical permit was filed May 26, 2026.

Also being built nearby

All of 78723
Email me when it passes final inspection