groundranger
Active · latest filing Oct 2026Commercial

6111 E US 290 Hwy Svrd Eb

Austin, TX 78723

44.625 kW rooftop solar system permitted in Austin

Austin permits indicate a new 44.625 kW DC rooftop solar PV system and an interconnection to the existing electrical service at 6111 E US 290 Hwy Svrd Eb. The first permit was filed September 21, 2026, with additional filings on September 24 and October 6; all three are listed as active.

Summarized from City of Austin records · updated Oct 6, 2026

Projects
3
3 filings
Latest filing
Oct 6, 2026
since Sep 21, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Installation of a new roof top solar pv system 44.625 kw dc and interconnection to the existing service

  1. AppliedSep 1, 2026
  2. IssuedOct 6, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
24% through of the permit windowOct 6, 2026 → Apr 10, 2027

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Installation of a new roof top solar pv system 44.625 kw dc and interconnection to the existing service

    Installation of a new roof top solar pv system 44.625 kw dc and interconnection to the existing service

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of a new roof top solar pv system 44.625 kw dc and interconnection to the existing service aux 26-116479

    Installation of a new roof top solar pv system 44.625 kw dc and interconnection to the existing service aux 26-116479

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installation of a new roof top solar pv system 44.625 kw dc and interconnection to the existing service

    Installation of a new roof top solar pv system 44.625 kw dc and interconnection to the existing service

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6111 E US 290 Hwy Svrd Eb

What is being built at 6111 E US 290 Hwy Svrd Eb?

Austin permits indicate installation of a 44.625 kW DC rooftop solar PV system connected to the existing service. The filings do not identify an occupant or owner.

When was the solar project at 6111 E US 290 permitted?

The first filing was September 21, 2026. Additional electrical permit filings followed on September 24 and October 6.

What are the permit numbers for the solar installation?

The records include building permit 2026-116477 BP, electrical permit 2026-116477 EP, and electrical permit 2026-116479 EP. Each is listed as active.

How large is the solar system planned for 6111 E US 290?

The permit descriptions specify a rooftop solar PV system rated at 44.625 kW DC.

Is solar being installed near Bao Bao in Austin?

Permits indicate rooftop solar installation at 6111 E US 290 Hwy Svrd Eb. Bao Bao is listed nearby, about 365 meters away.

Also being built nearby

All of 78723

More solar installs in 78723.

Email me when it passes final inspection