groundranger
Recent · latest filing Jun 2025Residential

6200 Reicher Dr

Austin, TX 78723

6200 Reicher Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 6200 Reicher Dr, Austin, TX 78723. The most recent, filed June 26, 2025, covers: “Tunnel and replace the drains under the slab. need to tunnel up to 10 feet and replace up to 5 feet of pipe”.

Compiled from City of Austin records · updated Jun 26, 2025

Projects
1
1 filings
Latest filing
Jun 26, 2025
since Jun 26, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Tunnel and replace the drains under the slab. need to tunnel up to 10 feet and replace up to 5 feet of pipe

  1. AppliedJun 25, 2025
  2. IssuedJun 26, 2025
  3. WorkJun '25 – Jul '25
  4. Final inspectionJul 3, 2025

Passed final inspection Jul 3, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Tunnel and replace the drains under the slab. need to tunnel up to 10 feet and replace up to 5 feet of pipe

    Tunnel and replace the drains under the slab. need to tunnel up to 10 feet and replace up to 5 feet of pipe

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6200 Reicher Dr

What is being built at 6200 Reicher Dr?

The latest filing (City of Austin permit 2025-079187 PP, June 26, 2025) covers tunnel and replace the drains under the slab. need to tunnel up to 10 feet and replace up to 5 feet of pipe.

How many permits and filings does 6200 Reicher Dr have?

1 filing across 1 project, from June 26, 2025 to June 26, 2025.

Is there other construction near 6200 Reicher Dr?

Yes. Nearby filings include 6115 Reicher Dr (replacement of complete existing central heat and air system with or without duct work, Mar 18, 2025); 6205 Reicher Dr (excavate 10 tunnel to repair drain line under house serving bathroom excavate 20 tunnel to repair drain line in second bathroom excavate 70 trench to repair main drain line in yard, May 27, 2025); 3102 Berrylawn Cir (base: installing a backup battery system and additional meter socket, Aug 7, 2026).

How do I get alerts for new permits at 6200 Reicher Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723
Email me when a new permit is filed