Fire Station 18 gets generator and HVAC upgrades

Permits filed in 2024 cover upgrades to the existing Fire Station 18 at 6311 Berkman Dr, not a new building. The work includes replacing a mini-split system and replacing the natural-gas generator’s automatic transfer switch and docking station, with a new equipment pad. The related permits were filed from April through November 2024 and are marked final.

Summarized from City of Austin records · updated Nov 6, 2024

Projects
6
6 filings
Latest filing
Nov 6, 2024
since Mar 2, 2007
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace an existing optional standby generator automatic transfer switch and a docking station on new equipment pad for existing fire station 18. this is a natural gas generator.no fire inspections required

  1. AppliedJun 3, 2024
  2. IssuedNov 6, 2024
  3. WorkNov '24 – Dec '24
  4. Final inspectionDec 10, 2024

Passed final inspection Dec 10, 2024.

1 contact on this project · 1 phone number

Permit & project history

6 projects
  1. Replace an existing optional standby generator automatic transfer switch and a docking station on new equipment pad for existing fire station 18. this is a natural gas generator.no fire inspections required

    Replace an existing optional standby generator automatic transfer switch and a docking station on new equipment pad for existing fire station 18. this is a natural gas generator.no fire inspections required

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace an existing optional standby generator automatic transfer switch and a docking station on new equipment pad for existing fire station 18. this is a natural gas generator.no fire inspections required

    Replace an existing optional standby generator automatic transfer switch and a docking station on new equipment pad for existing fire station 18. this is a natural gas generator.no fire inspections required

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replace an existing optional standby generator automatic transfer switch and a docking station on new equipment pad for existing fire station 18. this is a natural gas generator.no fire inspections required

    Replace an existing optional standby generator automatic transfer switch and a docking station on new equipment pad for existing fire station 18. this is a natural gas generator.no fire inspections required

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Replacement of mini-split system at fire station 18

    Replacement of mini-split system at fire station 18

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Berkman Fire Station #18 Renovation

    Berkman fire station #18 renovation

    City of Austin casesite_planApproved and Released
    Record
    10117526
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. BERKMAN FIRE STATION #18 RENOVATION

    Berkman fire station #18 renovation

    City of Austin casesite_planApproved and Released
    Record
    241031
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6311 Berkman Dr

What is happening at 6311 Berkman Dr in Austin?

City permits indicate upgrades to existing Fire Station 18, including a mini-split replacement and work on its natural-gas standby generator. The related 2024 permits are marked final.

Is a new building being built at 6311 Berkman Dr?

The 2024 permit descriptions refer to work at the existing Fire Station 18, not construction of a new building.

What generator work was permitted at Fire Station 18?

Permits cover replacing the existing natural-gas generator’s automatic transfer switch and docking station, with a new equipment pad. The building permit, 2024-073694 BP, was filed July 3, 2024.

When was the Fire Station 18 HVAC work permitted?

A mechanical permit for replacement of the station’s mini-split system was filed April 9, 2024. Permit 2024-042949 MP is marked final.

What is happening at 6311 Berkman Dr near 6405 Berkman TX?

At 6311 Berkman Dr, permits indicate equipment upgrades at existing Fire Station 18. A generator transfer-switch and docking-station replacement was covered by permits filed July 3, September 30 and November 6, 2024.

Are the permits for 6311 Berkman Dr final?

The four 2024 permits listed for the fire station are marked final. They include the mechanical permit 2024-042949 MP and three permits numbered 2024-073694.

Also being built nearby

All of 78723
Email me when a new permit is filed