City of Austin lists 2 filings across 2 projects at 6503 Ashland Cir, Austin, TX 78723. The most recent, filed March 14, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Mar 14, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 14, 2025
- since Mar 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMar 6, 2025
- IssuedMar 14, 2025
- WorkMar '25 – Apr '25
- Final inspectionApr 11, 2025
Passed final inspection Apr 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-027343 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
50 amp plug for ev charger
50 amp plug for ev charger
City of Austin permitElectrical PermitFinal- Record
- 2023-131046 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6503 Ashland Cir
What is being built at 6503 Ashland Cir?
The latest filing (City of Austin permit 2025-027343 MP, March 14, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 6503 Ashland Cir have?
2 filings across 2 projects, from March 14, 2025 to March 14, 2025.
Is there other construction near 6503 Ashland Cir?
Yes. Nearby filings include 6504 Highpoint Cv (replacement of complete existing central heat and air system with or without duct work, Jul 16, 2026); 6502 Ashland Cir (replacement of furnace only furnace/coil replacement only, May 8, 2026); 6509 Ashland Cir (express: foundation repair on a slab foundation. we intend to install 30 total press piling piers including 16 perimeter and 12 interior locations. there will be 14 breakthrough and patched locations. we will improve level to the extent, Oct 6, 2025).
How do I get alerts for new permits at 6503 Ashland Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 6504 Highpoint CvJul 16, 2026Replacement of complete existing central heat and air system with or without duct work · 43 m away
- 6502 Ashland CirMay 8, 2026Replacement of furnace only furnace/coil replacement only · 62 m away
- 6509 Ashland CirOct 6, 2025Express: foundation repair on a slab foundation. we intend to install 30 total press piling piers including 16 perimeter and 12 interior locations. there will be 14 breakthrough and patched locations. we will improve level to the extent · 73 m away
- 6508 Highpoint CvOct 21, 2026New 8ft fence along north property line (street side-loyola ln) · 80 m away
- 6600 Highpoint DrFeb 18, 2025Express: like for like replacement of 13 windows and 1 sliding door · 119 m away
- 6502 Greensboro DrAug 21, 2024Replacement of complete existing central heat and air system with or without duct work · 135 m away
- 6602 Highpoint DrDec 31, 2025Replacement of complete existing central heat and air system with or without duct work tracey allen - replacement of 3.5t horizontal like-for-like gas system · 144 m away
- 6604 Ashland DrAug 23, 2024Replacement of complete existing central heat and air system with or without duct work · 170 m away
- 4721 Loyola LnAug 26, 2025Adding dual head ev charger to parking lot for city of austin library · 170 m away
- 6501 Greensboro DrJan 10, 2025Installation of a 60-amp 240v dedicated branch circuit to support a single receptacle for high-powered appliances using rigid metal conduit (rmc) - primarily to be used for high powered appliances such as drills welders and other machine tools. **addition of sub-panel adjacent to main panel. a sub-panel will be installed approximately 2 inches adjacent to the main panel. an additional 2-gang metallic box will be installed approximately 5 inches from the originally planned receptacle box location which is an indoor location. the two 2-gang boxes will be connected using approximately 6 inches of 1-inch non-metallic liquid-tight flexible conduit. both boxes will be bonded to the equipment grounding conductor that was pulled as part of the main conduit run · 184 m away
- 4701-1/2 Loyola LnFeb 26, 2021University hills library parking lot expansion · 185 m away
- 5111 Loyola LnOct 1, 2026Sewer line replacement inspection · 188 m away