6803 Columbia Dr
Austin, TX 78723
Drain line repair permitted at 6803 Columbia Dr
A plumbing permit for work at 6803 Columbia Dr covers excavating a 50-foot tunnel to repair the main drain line under the house. The City of Austin issued the permit on June 8, 2026; the record does not list a project value or square footage.
Summarized from City of Austin records · updated Jun 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 8, 2026
- since Jun 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExcavate 50 tunnel to repair main drain line under house
- AppliedJun 1, 2026
- IssuedJun 8, 2026
- WorkJun '26 – Dec '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectExcavate 50 tunnel to repair main drain line under house
Excavate 50 tunnel to repair main drain line under house
City of Austin permitPlumbing PermitActive- Record
- 2026-068838 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6803 Columbia Dr
What work is permitted at 6803 Columbia Dr?
A City of Austin plumbing permit describes excavating a 50-foot tunnel to repair the main drain line under the house. The permit number is 2026-068838 PP.
When was the plumbing permit issued for 6803 Columbia Dr?
The City of Austin permit is dated June 8, 2026.
What is permit 2026-068838 PP for?
It covers excavation of a 50-foot tunnel to repair the main drain line under the house at 6803 Columbia Dr.
Is a new building planned at 6803 Columbia Dr?
The available City of Austin record is for a plumbing repair: excavating a tunnel to repair the main drain line under the house. It does not describe a new building.
How long is the tunnel for the drain repair at 6803 Columbia Dr?
The permit description specifies a 50-foot tunnel.
Also being built nearby
All of 78723- 6801 Columbia DrApr 29, 2024Place *request to disconnect* -installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service and 200 amp ats · 21 m away
- 6800 Duquesne DrFeb 17, 2025Tunnel under foundation to replace cast iron drain lines for two bathrooms kitchen and washer drain line to pvc. tunnel length is approximately 70 feet two access holes one in the back and one in the front of the home. replace sewer line from home to city tap connection length is about 30 feet · 41 m away
- 6704 Duquesne DrApr 2, 2024Irrigation permit · 57 m away
- 6707 Columbia DrNov 3, 2025Install owner supply ev charger a conduit and wire will travel from exterior breaker box to the ev charger station. new 200 amps meter base will be install and the main breaker will be upgrade to 200 amps and the wire and pipe · 59 m away
- 2106 Marquette LnAug 1, 2024Install new gas line in home · 74 m away
- 2107 Marquette LnDec 16, 2024Tunnel up to 55 to replace cast iron drains servicing kitchen and laundry. 2 tunnel access points. one in the back of home to access laundry line and one in the front of home to the left of the sidewalk to access the kitchen line · 77 m away
- 2103 Columbia CvFeb 27, 2025Replacement of complete existing central heat and air system with or without duct work hvac replacement · 82 m away
- 6710 Columbia DrJul 3, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system · 85 m away
- 6805 Duquesne DrMar 17, 2026In-ground swimming pool with a new concrete deck spa water pool & spa coping and equipment pad · 90 m away
- 2104 Marquette LnMar 12, 2025Express: replace 3 windows (like for like) · 94 m away
- 6807 Duquesne DrJan 11, 2024Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 6715 Haney DrJan 28, 2025Sewer yard line spot repair roughly 5ft · 99 m away