6809 De Paul Cv
Austin, TX 78723
Drain-line replacement permitted at 6809 De Paul Cv
A plumbing permit covers replacing cast-iron drain lines beneath the foundation at 6809 De Paul Cv with Schedule 40 PVC. The City of Austin permit was filed on December 9, 2025, and its status is Final.
Summarized from City of Austin records · updated Dec 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 9, 2025
- since Dec 9, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace cast-iron drain lines under the foundation (2) access holes one at the clean-out and (1) in the garage. we will replace it with sch 40 pvc
- AppliedDec 2, 2025
- IssuedDec 9, 2025
- WorkDec '25 – Jan '26
- Final inspectionJan 2, 2026
Passed final inspection Jan 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace cast-iron drain lines under the foundation (2) access holes one at the clean-out and (1) in the garage. we will replace it with sch 40 pvc
Replace cast-iron drain lines under the foundation (2) access holes one at the clean-out and (1) in the garage. we will replace it with sch 40 pvc
City of Austin permitPlumbing PermitFinal- Record
- 2025-153414 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6809 De Paul Cv
What work is being done at 6809 De Paul Cv?
A City of Austin plumbing permit describes replacing cast-iron drain lines beneath the foundation with Schedule 40 PVC.
When was the plumbing permit filed for 6809 De Paul Cv?
The permit was filed on December 9, 2025.
What is the permit number for 6809 De Paul Cv?
The City of Austin permit number is 2025-153414 PP.
Is the drain-line permit at 6809 De Paul Cv final?
Yes. The permit record lists its status as Final.
Are new homes or buildings being constructed at 6809 De Paul Cv?
The available permit describes plumbing work to replace drain lines beneath the foundation, not construction of a new building.
Also being built nearby
All of 78723- 6811 De Paul CvMay 5, 2025Tunnel under the foundation and replace cast iron drain lines at the kitchen laundry and bathroom. tunnel 80 lf and replace 80 lf of drain lines. no sheetrock removal. kitchen bathroom and laundry: access holes are outside at each location · 27 m away
- 6812 De Paul CvMar 18, 2025Express: tub-shower conversion in master bathroom · 49 m away
- 6804 De Paul CvFeb 22, 2024Replace water line to repair leak · 70 m away
- 6803 De Paul CvMar 6, 2024Replacement of an existing water heater · 72 m away
- 6822 Willamette DrSep 29, 2026200amp panel 200 amp meter base overhead riser grounding and bonding · 87 m away
- 2704 Loyola LnJun 17, 2024Full lawn irrigation install · 89 m away
- 2608 Loyola LnDec 2, 2024Interior remodel and garage conversion · 103 m away
- 6801 De Paul CvMay 19, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton vertical gas system · 107 m away
- 6811 Willamette DrFeb 4, 2026Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 6824 Willamette DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 111 m away
- 6809 Willamette DrMay 13, 2026Interior remodel new electrical system mechanical system paint flooring interior doors plumbing fixtures & cabinets. new exterior paint and asphalt shingle roof · 117 m away
- 2700 Dunbarton DrJul 12, 2026Electrical repair for existing home electrical system its currently with aluminum wire and all the outlets and switches will be remediate with alumiconn pigtails to tie in to the copper new deep boxes installed in some places. electrical work only will be performed · 125 m away