6816 Dubuque Ln
Austin, TX 78723
6816 Dubuque Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 6816 Dubuque Ln, Austin, TX 78723. The most recent, filed July 22, 2025, covers: “80 tunnel to replace all existing sewer lines under slab. there will be two access points one in front of the home and one in the back of the home. exposing and replacing all trunk and branch lines of sewer underneath slab”.
Compiled from City of Austin records · updated Jul 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 22, 2025
- since Jul 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled80 tunnel to replace all existing sewer lines under slab. there will be two access points one in front of the home and one in the back of the home. exposing and replacing all trunk and branch lines of sewer underneath slab
- AppliedJul 1, 2025
- IssuedJul 22, 2025
- WorkJul '25 – Dec '25
- Final inspectionDec 15, 2025
Passed final inspection Dec 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project80 tunnel to replace all existing sewer lines under slab. there will be two access points one in front of the home and one in the back of the home. exposing and replacing all trunk and branch lines of sewer underneath slab
80 tunnel to replace all existing sewer lines under slab. there will be two access points one in front of the home and one in the back of the home. exposing and replacing all trunk and branch lines of sewer underneath slab
City of Austin permitPlumbing PermitFinal- Record
- 2025-081804 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6816 Dubuque Ln
What is being built at 6816 Dubuque Ln?
The latest filing (City of Austin permit 2025-081804 PP, July 22, 2025) covers 80 tunnel to replace all existing sewer lines under slab. there will be two access points one in front of the home and one in the back of the home. exposing and replacing all trunk and branch lines of sewer underneath slab.
How many permits and filings does 6816 Dubuque Ln have?
1 filing across 1 project, from July 22, 2025 to July 22, 2025.
Is there other construction near 6816 Dubuque Ln?
Yes. Nearby filings include 6900 Dubuque Ln (replacement of complete existing central heat and air system with or without duct work with ductwork, Dec 13, 2025); 6811 Wake Forest Ln (addition/remodel. demolish rear patio awning. conversion of attached garage into a bedroom bathroom and laundry room. interior remodel. reconfigure interior layout. upgrade kitchen window and door replacement. addition/remodel will result in a 3 bedroom 2 bathroom single family residence. roll in scope of work from expired mp#: 2012-048104, Nov 2, 2026); 6903 Dubuque Ln (68 tunnel below the foundation to replace cast-iron drain system. 3 access holes - 2 in back and 1 in front, Jul 29, 2024).
How do I get alerts for new permits at 6816 Dubuque Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 6900 Dubuque LnDec 13, 2025Replacement of complete existing central heat and air system with or without duct work with ductwork · 19 m away
- 6811 Wake Forest LnNov 2, 2026Addition/remodel. demolish rear patio awning. conversion of attached garage into a bedroom bathroom and laundry room. interior remodel. reconfigure interior layout. upgrade kitchen window and door replacement. addition/remodel will result in a 3 bedroom 2 bathroom single family residence. roll in scope of work from expired mp#: 2012-048104 · 61 m away
- 6903 Dubuque LnJul 29, 202468 tunnel below the foundation to replace cast-iron drain system. 3 access holes - 2 in back and 1 in front · 63 m away
- 6806 Syracuse CvDec 13, 2023Tunnel below the foundation to repair drain line · 87 m away
- 6802 Syracuse CvAug 5, 2025Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 6906 Bryn Mawr DrMay 20, 2024Sewer line repair · 90 m away
- 6809 Dubuque LnJul 16, 202455 tunnel below the foundation to replace cast-iron drain system. two access holes - one access back utility one access front cleanout · 100 m away
- 6913 Bryn Mawr DrOct 8, 2026Gas test to eventually connect gas to meter · 105 m away
- 6807 Dubuque LnJan 27, 2025Express: replacing three windows at the front of the house · 119 m away
- 3203 Rockhurst LnAug 12, 2025Express: window replacement · 124 m away
- 6907 La Salle DrFeb 2, 2026Replacement of an existing water heater swap out of tankless gas water heater with a similar model tankless water heater · 131 m away
- 6912 Dubuque LnJul 20, 202669 tunnel below the foundation to replace entire drain system and 30 trench to replace yard sewer. three access holes-front left back · 134 m away