7105 Berkman Drive
Austin, TX 78723 · Austin Independent School District
Nelson Field baseball renovations registered in Austin
AISD Nelson Field’s baseball facilities are slated for turf replacement, two new batting cages, work on two existing dugouts, and new field lighting. The Texas Department of Licensing and Regulation registered the Phase 1 project on May 21, 2026. The registration lists 2,345 square feet of additions and 390 square feet of remodeled space, with an applicant-estimated cost of $6.8 million.
Summarized from Texas Department of Licensing and Regulation records · updated May 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2026
- since May 21, 2026
- Largest scope
- 2,735 sf
- Estimated cost
- $6.8M
- state registration
Where this project stands
In state plan reviewAISD Nelson Field Additions & Renovations (Phase 1)
2,735 sq ft · $6.8M est.
- RegisteredMay 21, 2026
- Plan reviewnow
- ConstructionJul '26 – Feb '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplace existing baseball field turf. install two (2) new batting cages. renovations and additions to two (2) existing baseball field dugouts. install new baseball field lighting. added/new sq ft: 2,345 sq ft | remodeled sq ft: 390 sq ft | total sq ft of buildings: — aisd nelson field
TDLR project registrationRenovation/AlterationProject Registered2,735 sq ft$6.8M est.- Project #
- TABS2026020903
- Tenant / owner
- Aisd Nelson Field Additions & Renovations (phase 1)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7105 Berkman Drive
What is being built at 7105 Berkman Drive?
The Phase 1 project at AISD Nelson Field includes two new batting cages and additions and renovations to two existing baseball dugouts. It also calls for replacing the field turf and installing new baseball field lighting.
When was the Nelson Field project registered?
The Texas Department of Licensing and Regulation registered project TABS2026020903 on May 21, 2026.
Is the baseball field getting new turf and lighting?
Yes. The project registration calls for replacing the existing baseball field turf and installing new field lighting.
How much is the Nelson Field renovation expected to cost?
The TDLR registration lists an applicant-estimated project cost of $6.8 million. This is an estimate, not a confirmed final cost.
How much new space is planned at Nelson Field?
The registration lists 2,345 square feet of new space and 390 square feet of remodeled space.
What is being built near AutoZone on Berkman Drive?
AISD Nelson Field’s Phase 1 baseball renovations are planned at 7105 Berkman Drive, about 432 meters from the AutoZone listed at 6800 Berkman Drive.
Also being built nearby
All of 78723- 7104 Berkman Dr Austin Texas 78752 · Austin Independent School DistrictNov 22, 2024Aisd northeast echs & international school — additions to existing building — partial redevelopment of the existing school campus, parking, utilities, fields and pond improvements. and substantial addition and renovation of buildings on campus · 13 m away
- 7104 Berkman Dr · Austin Independent School DistrictSep 4, 2026Aisd - northeast echs · 37 m away
- 7105 Berkman DrNov 4, 2026Eplan: commercial expedited review - renovation and addition to 2 existing dugouts installation of new lightning and new batting cages and replacement of field turf (2735 sq ft) · 110 m away
- 7200 Berkman DrNov 6, 2024Replace an existing option generator and automatic transfer switch and add a docking station on the equipment pad with a new concrete pad for the existing ems14. site plan exemption not required less than 100 sq ft · 113 m away
- 1500 E St Johns AveJan 13, 2026Install irrigation · 185 m away
- 1500 St Johns AveJul 17, 2026Cairn point -austin (smart housing/affordabilty unlocked) · 185 m away
- 7207 Coronado CirAug 19, 2024Express: replace water heater replace windows on home replace ceiling fan. tub to shower conversion. replace hvac · 292 m away
- 7209 Coronado CirMay 5, 2026Replacement of complete existing central heat and air system with or without duct work hvac system replacement for joseph jabr · 300 m away
- 6912 E US 290 Hwy Svrd WbMay 30, 2024Change of use from auto repair to auto sales and services (tire repair) · 329 m away
- 7214 Coronado CirDec 12, 2023Replacement of complete existing central heat and air system with or without duct work · 340 m away
- 7221 Coronado CirSep 11, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 349 m away
- 7260 Coronado CirNov 8, 2025Replacement of complete existing central heat and air system with or without duct work · 349 m away