7404 Bucknell Dr
Austin, TX 78723
Sewer-pipe replacement permitted at 7404 Bucknell Dr
A plumbing permit indicates work to replace deteriorated cast-iron pipe beneath the home and from the house to the city sewer tap. The City of Austin issued permit 2026-102011 PP on August 12, 2026; its status is Final.
Summarized from City of Austin records · updated Aug 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 12, 2026
- since Aug 12, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel up to 60 to replace the deteriorated cast iron pipe underneath the home and excavate up to 60 to replace the cast iron from the house to the city sewer tap
- AppliedAug 6, 2026
- IssuedAug 12, 2026
- WorkAug '26 – Sep '26
- Final inspectionSep 2, 2026
Passed final inspection Sep 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel up to 60 to replace the deteriorated cast iron pipe underneath the home and excavate up to 60 to replace the cast iron from the house to the city sewer tap
Tunnel up to 60 to replace the deteriorated cast iron pipe underneath the home and excavate up to 60 to replace the cast iron from the house to the city sewer tap
City of Austin permitPlumbing PermitFinal- Record
- 2026-102011 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7404 Bucknell Dr
What is being built at 7404 Bucknell Dr?
A City of Austin plumbing permit describes tunneling and excavation to replace deteriorated cast-iron pipe beneath the home and from the house to the city sewer tap. It records pipe-replacement work, not a new building.
What work does permit 2026-102011 PP cover?
The permit covers tunneling up to 60 to replace pipe beneath the home and excavation up to 60 to replace cast-iron pipe from the house to the city sewer tap.
When was the plumbing work at 7404 Bucknell Dr permitted?
The City of Austin permit was filed on August 12, 2026.
Is the permit for 7404 Bucknell Dr approved?
The City of Austin lists permit 2026-102011 PP as Final.
Is a new home being built at 7404 Bucknell Dr?
The available permit describes plumbing work to replace cast-iron pipe beneath the home and connect the house to the city sewer tap. It does not describe new home construction.
Also being built nearby
All of 78723- 7401 Bucknell DrAug 16, 2024Replacement of an existing water heater · 68 m away
- 7312 Bucknell DrMar 20, 2026Eplan: residential expedited review - interior remodel to existing 1-story single family res. [3bed 2bath] replace all plumbing fixtures light fixtures cabinets flooring interior doors replace exterior doors and windows add wall in ding to create pantry add new can lights. inspection for replacement of water heater from permit 2022 086671 pp · 73 m away
- 7404 Charlton DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 97 m away
- 7305 Geneva DrApr 22, 2026Slab penetration in garage to tunnel 5 below the foundation to repair the kitchen drain line and 80 tunnel to replace entire drain system. 3 access holes - front right left · 114 m away
- 7303 Geneva DrOct 20, 2026Replacing cast iron sewer line with pvc piping and connecting with existing sewer yard line · 131 m away
- 7308 Geneva DrJul 17, 2025Express: tub to shower conversion in hall bathroom revision-replace gfci outlets in kitchen · 139 m away
- 7306 Geneva DrJun 23, 2025Tunnel under the foundation to replace the cast iron drain line at the kitchen bathroom and laundry · 145 m away
- 7305 Middlebury CvJan 8, 2025200 amp service rebuild riser meter. the home has a barn style shaped roof and eve is 10 6 off grade to raise new riser to 12 6 will take rise to the right and 90 up and support riser with either carriage bolts supported through framing in bedroom upstairs or build strut rack lag bolted through bottom of eve. one line drawings for reference need ae spot to approve riser location · 152 m away
- 7314 Geneva DrAug 15, 2025Replacement of an existing water heater replace 40gal gas water heater · 175 m away
- 7304 Middlebury CvSep 6, 2024Install level 2 ev charger · 182 m away
- 7300 Geneva DrMar 25, 2026Complete overhead service rebuild and upgrade. includes new riser/wire new meter can new 200a panel · 181 m away
- 7307 Hartnell DrNov 2, 2026New irrigation installation · 184 m away