12400 Jarrod Lee Cv
Austin, TX 78724
49-panel rooftop solar system permitted in Austin
Austin permits show a 20.335-kW rooftop solar system with 49 panels tied into the existing 200-amp main service at 12400 Jarrod Lee Cv. The installation permit, 2025-096760 EP, was filed August 8, 2025, and is marked final.
Summarized from City of Austin records · updated Aug 8, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 8, 2025
- since Apr 28, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCorrelating repair permit 2025-050922 ep is finaled but looks like aux permit was not generated properly. install 49 (415w) roof mounted solar panels 20.335 kw solar service system tying into existing 200 amp rated msp
- AppliedAug 1, 2025
- IssuedAug 8, 2025
- WorkAug '25 – Feb '26
- Final inspectionSep 2, 2025
Passed final inspection Sep 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsCorrelating repair permit 2025-050922 ep is finaled but looks like aux permit was not generated properly. install 49 (415w) roof mounted solar panels 20.335 kw solar service system tying into existing 200 amp rated msp
Correlating repair permit 2025-050922 ep is finaled but looks like aux permit was not generated properly. install 49 (415w) roof mounted solar panels 20.335 kw solar service system tying into existing 200 amp rated msp
City of Austin permitElectrical PermitFinal- Record
- 2025-096760 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Shut-down request: utility shut-down required for battery install. project is travis county with ae utility
Shut-down request: utility shut-down required for battery install. project is travis county with ae utility
City of Austin permitElectrical PermitFinal- Record
- 2025-050922 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12400 Jarrod Lee Cv
What is being built at 12400 Jarrod Lee Cv?
City of Austin records describe a 20.335-kW rooftop solar system with 49 panels at the address. The panels tie into the existing 200-amp main service.
When was the solar permit filed at 12400 Jarrod Lee Cv?
Permit 2025-096760 EP was filed August 8, 2025. Its status is listed as final.
How many solar panels are planned for 12400 Jarrod Lee Cv?
The permit description specifies 49 roof-mounted panels, each rated at 415 watts, for a 20.335-kW system.
Is a battery installation listed at 12400 Jarrod Lee Cv?
A separate electrical permit, 2025-050922 EP, filed April 28, 2025, records a utility shutdown request for a battery installation. The record does not specify the battery's size or confirm its installation.
Is the solar permit at 12400 Jarrod Lee Cv final?
Yes. City of Austin records list permit 2025-096760 EP, filed August 8, 2025, as final.
Also being built nearby
All of 78724- 7650 Trailside Estates BlvdAug 7, 2025Upgrade the main service from 200 amps to 325 amps · 295 m away
- 8101 FM 973 RdSep 27, 2024Maverick subdivision · 414 m away
- 7400 Zekelman BlvdSep 30, 2026Flatz-130 (with r sp-2023-0356d) · 471 m away
- 8108 FM 973 RdJan 9, 2014Hayes trucking · 527 m away
- 7720 Gilbert RdMay 2, 2008Villa st. clair · 535 m away
More solar installs in 78724.