5328 Agatha Cir
Austin, TX 78724
Residential solar and energy storage upgrades in Austin
City of Austin permits show a 9.2 kW rooftop solar system at this residence, permitted February 20, 2025. Two permits dated August 13, 2025, cover adding 15 kW of energy storage to the existing solar system and work involving a 200-amp automatic transfer switch.
Summarized from City of Austin records · updated Aug 13, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 13, 2025
- since Feb 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAdding new 15 kw energy storage to the existing solar energy system on an existing residential only
- AppliedAug 12, 2025
- IssuedAug 13, 2025
- WorkAug '25 – Nov '25
- Final inspectionNov 3, 2025
Passed final inspection Nov 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsAdding new 15 kw energy storage to the existing solar energy system on an existing residential only
Adding new 15 kw energy storage to the existing solar energy system on an existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-101868 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required
Request to disconnect new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required
City of Austin permitElectrical PermitFinal- Record
- 2025-101905 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 9.2 kw rooftop solar system to existing residential only
Install new 9.2 kw rooftop solar system to existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-015298 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5328 Agatha Cir
What is being added at 5328 Agatha Cir?
City permit records describe a 9.2 kW rooftop solar system and a later 15 kW energy storage addition to the existing solar system.
When were the solar and energy storage permits filed?
The solar permit, 2025-015298 EP, was filed February 20, 2025. The energy storage permit, 2025-101868 EP, was filed August 13, 2025.
Is this a commercial solar project?
The permit descriptions identify the property as an existing residence and describe the solar work as residential.
What does permit 2025-101905 EP cover?
Filed August 13, 2025, the electrical permit describes a request to disconnect a new 200-amp automatic transfer switch installation on the existing 200-amp panel. It says no new meter can is required.
How much does the project cost?
The available permit records do not report a project cost.
Also being built nearby
All of 78724- 5308 Sendero Hills PkwyFeb 2, 2026Express- foundation repair · 104 m away
- 5301 Agatha CirJul 17, 2025Express: a vehicle hit the side of the house at the front corner repairs will require framing electrical drywall siding and windows · 105 m away
- 5356 Agatha CirFeb 2, 2024(clark tesla paul ) - installation of ev charger bi-directional capable - esip · 111 m away
- 5237 Sendero Hills PkwyJun 14, 2024Express existing foundation repair · 158 m away
- 5313 Sendero Hills PkwyMar 17, 2026Express: foundation repair · 188 m away
- 5338 Sendero Hills PkwyFeb 17, 2025Tankless change out like for like · 190 m away
- 7300 Ava LnNov 26, 2025Express: foundation repair · 199 m away
- 7304 Ava LnJan 31, 2024New construction two-family residential 1-story secondary apartment 1 bedroom 1 bath with covered porch · 227 m away
- 5341 Sendero Hills PkwyNov 11, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal gas system · 230 m away
- 5337 Sendero Hills PkwyApr 3, 2026Replacement of complete existing central heat and air system with or without duct work · 233 m away
- 5421 Agatha CirSep 18, 2024Replacement of complete existing central heat and air system with or without duct work · 241 m away
- 5420 Agatha CirJul 22, 2025Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 252 m away
More warehouses & industrial in 78724, solar installs in 78724.