5328 Agatha Cir

Austin, TX 78724

Residential solar and energy storage upgrades in Austin

City of Austin permits show a 9.2 kW rooftop solar system at this residence, permitted February 20, 2025. Two permits dated August 13, 2025, cover adding 15 kW of energy storage to the existing solar system and work involving a 200-amp automatic transfer switch.

Summarized from City of Austin records · updated Aug 13, 2025

Projects
3
3 filings
Latest filing
Aug 13, 2025
since Feb 20, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Adding new 15 kw energy storage to the existing solar energy system on an existing residential only

  1. AppliedAug 12, 2025
  2. IssuedAug 13, 2025
  3. WorkAug '25 – Nov '25
  4. Final inspectionNov 3, 2025

Passed final inspection Nov 3, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Adding new 15 kw energy storage to the existing solar energy system on an existing residential only

    Adding new 15 kw energy storage to the existing solar energy system on an existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required

    Request to disconnect new 200 amp automatic transfer switch installation on the existing 200 amp panel no new meter can is required

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Install new 9.2 kw rooftop solar system to existing residential only

    Install new 9.2 kw rooftop solar system to existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5328 Agatha Cir

What is being added at 5328 Agatha Cir?

City permit records describe a 9.2 kW rooftop solar system and a later 15 kW energy storage addition to the existing solar system.

When were the solar and energy storage permits filed?

The solar permit, 2025-015298 EP, was filed February 20, 2025. The energy storage permit, 2025-101868 EP, was filed August 13, 2025.

Is this a commercial solar project?

The permit descriptions identify the property as an existing residence and describe the solar work as residential.

What does permit 2025-101905 EP cover?

Filed August 13, 2025, the electrical permit describes a request to disconnect a new 200-amp automatic transfer switch installation on the existing 200-amp panel. It says no new meter can is required.

How much does the project cost?

The available permit records do not report a project cost.