Emergency meter-loop replacement at 5704 Jacqueline Ln
A City of Austin electrical permit covers emergency replacement of a meter loop at 5704 Jacqueline Ln. Filed June 8, 2026, the record says the contractor’s work was already done and an ESPA must be uploaded before final inspection.
Summarized from City of Austin records · updated Jun 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 8, 2026
- since Jun 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayEtj-emergency-replace meter loop (called out to contractor work is already done will need to upload espa prior to final)
- AppliedJun 8, 2026
- IssuedJun 8, 2026
- WorkJun '26 – Dec '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectEtj-emergency-replace meter loop (called out to contractor work is already done will need to upload espa prior to final)
Etj-emergency-replace meter loop (called out to contractor work is already done will need to upload espa prior to final)
City of Austin permitElectrical PermitActive- Record
- 2026-072557 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5704 Jacqueline Ln
What work is happening at 5704 Jacqueline Ln?
A City of Austin electrical permit covers emergency replacement of a meter loop. The permit description says the contractor’s work was already done.
When was the meter-loop replacement permitted?
The City of Austin filed permit 2026-072557 EP on June 8, 2026.
Is permit 2026-072557 EP still active?
Yes. The City of Austin record lists the electrical permit as Active.
Does the permit say the work is complete?
The description says the contractor’s work was already done. It also notes that an ESPA must be uploaded before final.
How much does the meter-loop replacement cost?
The permit record does not list a project valuation or cost estimate.
Also being built nearby
All of 78724- 5707 Jacqueline LnAug 1, 2024New panel and meter · 50 m away
- 15415 Trumpet DrNov 12, 2024Applying for a the sign intake for 15415 dr. service rack to be reviewed to install for 4 200amp meter sockets they will be serving 4 150 amp breaker enclosure. (service only) theres one existing meter but its moving to the service rack so at the end of the project were gonna have a rack with 5 meters 15415 trumpet dr 15415 trumpet dr 1 2 1a 1b · 86 m away
- 5615 Jfk DrNov 16, 202314.985kw dc roof mount solar pv system with 37 q cell q.peak duo blk ml-g10+ 405w 37 enphase iq8plus-72-m-us micro inverter main panel upgrade required 225a main panel · 165 m away
- 5904 Jacqueline LnNov 10, 2026Install new standalone 200-amp electrical service pole to provide power to the property. scope includes installation of treated service pole 200a meter socket main disconnect grounding electrode system service entrance conductors utility attachment point and all associated equipment in compliance with current nec and local utility requirements · 202 m away
- 5801 Wideleaf DrApr 23, 2008Forest bluff section 4 (plat vacation) · 203 m away
- 15401 Armstrong AveJan 30, 2026Relocation of existing electrical service ae remove electrical meter due new location required · 273 m away
- 15407 Armstrong AveAug 26, 2024New electrical service for quadplex in etj · 295 m away
- 15208 Mimebark WayNov 16, 20232.835kw dc roof mount solar pv system with 7 q cell q.peak duo blk ml-g10+ 405w 7 enphase iq8plus-72-2-us micro inverter no main panel upgrade required · 306 m away
- 15206 Wideleaf CvJul 10, 2024Auxiliary permit needed - solar permit is pulled with travis county - install residential roof mounted solar photovoltaic system: 7.380 kw dc roof mount solar pv system - 18 hanwha q cells q.peak duo blk ml-g10+ 410w pv modules with - 18 enphase iq8plus-72-2-us microinverters · 312 m away
- 5412 Cadillac DrMay 11, 2022Cadillac drive mobile home development · 322 m away
- 6001 Jfk DrNov 27, 2023Install meter loop for mobile home · 324 m away
- 6005 Jfk DrSep 12, 2024Upgrade existing single metered main to 2-200a metered mains with 2 main panelboards · 358 m away