5829 Pinon Vista Dr
Austin, TX 78724
5829 Pinon Vista Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5829 Pinon Vista Dr, Austin, TX 78724. The most recent, filed June 19, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jun 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 19, 2024
- since Jun 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 12, 2024
- IssuedJun 19, 2024
- !WorkJun '24 – Jun '25
- Final inspection
Marked expired Jun 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-074201 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5829 Pinon Vista Dr
What is being built at 5829 Pinon Vista Dr?
The latest filing (City of Austin permit 2024-074201 MP, June 19, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 5829 Pinon Vista Dr have?
1 filing across 1 project, from June 19, 2024 to June 19, 2024.
Is there other construction near 5829 Pinon Vista Dr?
Yes. Nearby filings include 5841 Pinon Vista Dr (replacement of complete existing central heat and air system with or without duct work del rosario, Jul 31, 2026); 5912 Toscana Ave (replacement of an existing water heater exterior gas tankless, Mar 20, 2025); 5816 Toscana Ave (replacement of complete existing central heat and air system with or without duct work, Jun 17, 2026).
How do I get alerts for new permits at 5829 Pinon Vista Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78724- 5841 Pinon Vista DrJul 31, 2026Replacement of complete existing central heat and air system with or without duct work del rosario · 44 m away
- 5912 Toscana AveMar 20, 2025Replacement of an existing water heater exterior gas tankless · 65 m away
- 5816 Toscana AveJun 17, 2026Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 5916 Toscana AveMay 4, 2026Repair: detach 3 inch pvc from meter sleeve in a new piece and attach it to meter base · 78 m away
- 5812 Toscana AveAug 25, 2026Replacement of complete existing central heat and air system with or without duct work full hvac system changeout · 78 m away
- 5805 Pinon Vista DrAug 13, 2025Installation of 13.8kw solar pv system to residence · 84 m away
- 5920 Toscana AveNov 3, 2025Plumbing tunnel with 2 access holes inside with repairs on the kitchen branchline and bathroom branchline and 1 access hole outside at clean out with a repair on the main line · 90 m away
- 5800 Pinon Vista DrJun 17, 2026Express: foundation repair - install 18 push piers · 99 m away
- 5901 Toscana AveMar 27, 2025Replacement of complete existing central heat and air system with or without duct work 3 ton vertical electric heat pump system · 101 m away
- 5817 Signal PtMar 20, 2024Express - foundation pressed pier installation and level. install 21 piers 15 exterior 6 interior · 101 m away
- 5900 Florencia LnMay 8, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 5 ton ac system · 102 m away
- 6004 Toscana AveApr 6, 2026Replacement of an existing water heater navien gas tankless water heater · 117 m away