Central heating and air system replacement at 6308 Keegans Dr
A City of Austin permit dated July 23, 2026, covers replacement of the existing central heating and air system at 6308 Keegans Dr. Earlier permits in October and November 2023 covered electrical and plumbing work for a 532-square-foot concrete swimming pool and spa. The listed permits are final.
Summarized from City of Austin records · updated Jul 23, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 23, 2026
- since Jul 23, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 14, 2026
- IssuedJul 23, 2026
- WorkJul '26 – Jan '27
- Final inspectionSep 16, 2026
Passed final inspection Sep 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-090713 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New concrete swimming pool and spa (532 sq ft)
New concrete swimming pool and spa (532 sq ft)
City of Austin permitElectrical PermitFinal- Record
- 2023-132113 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New concrete swimming pool and spa (532 sq ft)
New concrete swimming pool and spa (532 sq ft)
City of Austin permitPlumbing PermitFinal- Record
- 2023-132113 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6308 Keegans Dr
What work is happening at 6308 Keegans Dr?
A July 23, 2026, City of Austin permit covers replacing the existing central heat and air system, with or without duct work. The permit, 2026-090713 MP, is listed as final.
Is a new house being built at 6308 Keegans Dr?
The records provided do not show a new house permit. They show a central heating and air system replacement in 2026 and permits for a swimming pool and spa in 2023.
Was a pool permitted at 6308 Keegans Dr?
Yes. City of Austin permits dated October 24 and November 8, 2023, cover plumbing and electrical work for a new 532-square-foot concrete swimming pool and spa. Both are listed as final.
What is permit 2026-090713 MP for in Austin?
It is a mechanical permit for replacement of the complete existing central heating and air system at 6308 Keegans Dr. It was filed July 23, 2026, and is listed as final.
What permits are on file near Building 1, Building 2, and Building 3 on Johnny Morris Road?
The records identify those buildings at 7000 Johnny Morris Road, about 264 meters from 6308 Keegans Dr. At 6308 Keegans Dr, the listed permits cover a heating and air system replacement and earlier pool and spa work.
Also being built nearby
All of 78724- 6301 Keegans DrFeb 25, 2026(grell erin) - installation of circuit for elec. vehicle charging station - esip · 60 m away
- 6313 Keegans DrSep 25, 2024(nguyen thao) - installation of circuit for elec. vehicle charging station - esip · 89 m away
- 7104 Boyle DrJan 14, 2026Install whole home surge protection and car charger 110v plug in garage · 135 m away
- 7208 Zachary DrSep 27, 2024Construct new driveway approach of 20 ft and sidewalk of 30 lf no conflict found · 191 m away
- 7001 Boyle DrJul 20, 2024Install evse · 192 m away
- 7212 Zachary DrOct 3, 2024Construct new driveway approach of 20 ft and sidewalk 30 lf no conflict found · 207 m away
- 7208 Boyle DrDec 9, 2025Pool - construction of a new in-ground pool concrete deck and equipment pad · 209 m away
- 7209 Zachary DrOct 1, 2024Replacement of an existing water heater · 213 m away
- 6409 Farrell Glen DrApr 16, 2026Building drain replacement tunnel project. under home · 220 m away
- 7008 Johnny Morris RdAug 20, 2025Amended plat of lot 1, worley & barton subd. & lot 1, blk a, am station · 241 m away
- 6601 Johnny Morris CvAug 27, 2025Excavate 15 tunnel to repair main drain line under house · 258 m away
- 7000 Johnny Morris RoadMay 2, 2025Collective east — new construction — work includes three single-story cold dark shell buildings with mezzanines (1,2 & 3) · 264 m away