6329 Florencia Ln
Austin, TX 78724
Backup battery system permitted at 6329 Florencia Ln
A City of Austin electrical permit covers installation of a backup battery system and an additional meter socket at 6329 Florencia Ln. The permit was filed on October 16, 2026, and is listed as active.
Summarized from City of Austin records · updated Oct 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 16, 2026
- since Oct 16, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBase: installing a backup battery system and additional meter socket
- AppliedOct 9, 2026
- IssuedOct 16, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-133204 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6329 Florencia Ln
What is being installed at 6329 Florencia Ln?
A City of Austin electrical permit covers a backup battery system and an additional meter socket. The permit was filed October 16, 2026.
When was the permit for 6329 Florencia Ln filed?
The electrical permit was filed on October 16, 2026.
What is the permit number for 6329 Florencia Ln?
The City of Austin permit number is 2026-133204 EP. It is listed as active.
Is a new home being built at 6329 Florencia Ln?
The available record is for electrical work to install a backup battery system and an additional meter socket. It does not describe new home construction.
How much will the work at 6329 Florencia Ln cost?
The permit record does not list a project valuation.
Also being built nearby
All of 78724- 7317 Cordoba DrJan 26, 2024New inground swimming pool with reqd enclosure device for existing 2-story sfr · 45 m away
- 6309 Florencia LnSep 5, 2025Repair gas leak behind dryer · 61 m away
- 6216 Florencia LnSep 3, 2024Install evse · 77 m away
- 7320 Cordoba DrOct 21, 2026Base: installing a backup battery system and additional meter socket · 86 m away
- 7401 Cordoba DrJan 14, 20265ft tunnel for sewer line repair · 87 m away
- 6209 Seville DrJun 9, 2026Car charger 50 amp circuit with surge protector · 87 m away
- 7304 Cordoba DrMar 14, 2024Install evse · 95 m away
- 6312 Perlita DrMar 4, 2024Express - replace 14 windows · 100 m away
- 7212 Cordoba DrAug 25, 2026Base: installing a backup battery system and additional meter socket · 120 m away
- 7413 Cordoba DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 133 m away
- 6133 Seville DrJan 3, 2025Installation of a level 2 charger in the garage · 133 m away
- 6301 Sendero Hills PkwyMar 28, 2024Installation of 7.48kw roof mounted solar system · 136 m away