6705 Crystalbrook Drive
Austin, TX 78724 · Davis White NE Np: Playscape Replacement, Davis/ White Northeast Neighborhood Park Fitness Equipment
Davis White Park playscape replacement in Austin
A playscape renovation at Davis White Northeast Neighborhood Park includes replacement play equipment, updated sidewalks and curbs, and an ADA access pathway. The project was registered with TDLR on October 10, 2024; the applicant estimated its cost at $200,000, and the record is marked closed.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 10, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Oct 10, 2024
- since Oct 10, 2024
- Largest scope
- 15,000 sf
- Estimated cost
- $200K
- state registration
Where this project stands
CompletedDavis White NE NP: Playscape Replacement
15,000 sq ft · $200K est.
- RegisteredOct 10, 2024
- Plan review
- ConstructionOct '24 – Feb '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
2 projectsPlayscape renovation includes replacement of play equipment, updated sidewalk and curbs, ada access pathway. approximate sq ft is 15,000. — davis white northeast neighborhood park
TDLR project registrationRenovation/AlterationProject Closed15,000 sq ft$200K est.- Project #
- TABS2025002911
- Tenant / owner
- Davis White NE Np: Playscape Replacement
- Design firm
- Pro
- Contact
- Pro
Installation of new outdoor fitness equipment, poured-in-place safety surfacing and concrete curb. — davis/ white northeast neighborhood park
TDLR project registrationNew ConstructionProject Closed1,390 sq ft$79K est.- Project #
- TABS2023019074
- Tenant / owner
- Davis/ White Northeast Neighborhood Park Fitness Equipment
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6705 Crystalbrook Drive
What is being built at 6705 Crystalbrook Drive?
The project is a playscape renovation at Davis White Northeast Neighborhood Park, including replacement play equipment, updated sidewalks and curbs, and an ADA access pathway.
Is a new park being built at 6705 Crystalbrook Drive?
No new park is described in the record. The work is a renovation of the existing playscape at Davis White Northeast Neighborhood Park.
When was the Davis White Park playscape project registered?
The TDLR registration is dated October 10, 2024. The project is listed as closed.
How much will the Davis White Park playscape replacement cost?
The TDLR record lists an applicant estimate of $200,000 for the project.
What improvements are planned for the Davis White Northeast Neighborhood Park playscape?
The registration describes replacing play equipment and updating sidewalks, curbs, and an ADA access pathway.
How large is the Davis White Park playscape project?
The TDLR registration lists an approximate project area of 15,000 square feet.
Also being built nearby
All of 78724- 6805 Crystalbrook DrApr 28, 2026Replacement of an existing water heater stephen esparza · 190 m away
- 6101 Loyola LnNov 10, 2026Aw - greater walnut ocf (loyola) · 206 m away
- 5811 Whitebrook DrJul 31, 2025Replacement of complete existing central heat and air system with or without duct work 2 systems- heat pump (right side) and gas furnace (left side) · 209 m away
- 5807 Whitebrook DrJan 3, 2024Install evse at garage · 221 m away
- 5803 Whitebrook DrJun 16, 2025Replace 125 amp main service with a 200 amp main service and install a main grounding system · 240 m away
- 5807 Coolbrook DrMar 16, 2026Express: replace three windows like-for-like · 257 m away
- 5808 Whitebrook DrJan 19, 2026Install circuit to shed to off of spare 20a breaker to install 2 duplex outlets and a light. the shed dimension is 10x12 120sqft · 258 m away
- 6813 Crystalbrook DrAug 27, 2024Main water service from meter to home · 270 m away
- 5804 Whitebrook DrApr 26, 2026Upgrade the existing electrical meter and main panel with new 200 amp new electrical meter and main panel · 273 m away
- 5807 Boulder CreekMar 2, 2007Future generations childcare & learning center · 302 m away
- 5705 Whitebrook DrFeb 25, 2025Replacement of complete existing central heat and air system with or without duct work · 343 m away
- 6200 Loyola LnMar 2, 2007Park place apartments (smart housing) · 354 m away