6711 Johnny Morris Road
Austin, TX 78724 · Austin Independent School District
Classroom and roof renovations planned at Barbara Jordan Elementary
A renovation project at Barbara Jordan Elementary School includes updating existing classrooms for a new use, upgrading air conditioning in eight classrooms, updating signage and installing a new roof membrane. The project was registered with TDLR on January 23, 2026, under project number TABS2026010733; the applicant’s estimated cost is $2,660,343.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 23, 2026
- since Jan 23, 2026
- Largest scope
- 1,199 sf
- Estimated cost
- $2.7M
- state registration
Where this project stands
Under constructionImprovements and Repairs at Barbara Jordan Elementary School
1,199 sq ft · $2.7M est.
- RegisteredJan 23, 2026
- Plan review
- ConstructionJun '26 – Aug '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe project involves renovating existing classrooms for a new use, including updating finishes and adding new walls, upgrades a/c in 8 classrooms, and updating signage as well as a new roof membrane. — barbara jordan elementary school
TDLR project registrationRenovation/AlterationReview Complete1,199 sq ft$2.7M est.- Project #
- TABS2026010733
- Tenant / owner
- Improvements And Repairs At Barbara Jordan Elementary School
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6711 Johnny Morris Road
What is being built at 6711 Johnny Morris Road?
The TDLR registration describes renovations at Barbara Jordan Elementary School, including classroom updates, air-conditioning upgrades in eight classrooms, signage work and a new roof membrane. It was filed January 23, 2026, as project TABS2026010733.
Is a new school being built at 6711 Johnny Morris Road?
The record describes renovation and alteration work at the existing Barbara Jordan Elementary School, not a new school building.
What work is planned at Barbara Jordan Elementary School?
The project involves updating existing classrooms for a new use, adding new walls, updating finishes and signage, upgrading air conditioning in eight classrooms, and installing a new roof membrane.
When was the Barbara Jordan Elementary School project filed?
The TDLR registration was filed January 23, 2026. Its project number is TABS2026010733, and its status is listed as Review Complete.
How much will the Barbara Jordan Elementary School renovations cost?
The applicant’s estimated cost for the project is $2,660,343. This is an estimate, not a reported final project cost.
What is being renovated near Loyola Religious Event Center?
Barbara Jordan Elementary School, at 6711 Johnny Morris Road, has a registered renovation project involving classrooms, air conditioning, signage and the roof. The Loyola Religious Event Center is listed about 297 meters away.
Also being built nearby
All of 78724- 6711 Johnny Morris Rd · Austin Independent School DistrictDec 9, 2024Interior remodel of front office and new storefront enclosure. aisd project - fees waived · 43 m away
- 6507-1/2 Loyola LnAug 30, 2013Indian hills 48-inch water line no. 1 · 67 m away
- 6800 Johnny Morris RdAug 7, 2024Change of use from office to barber shop and interior remodeling - will include the partial demolition and then the construction of partitions ceilings finishes and mechanical electrical and plumbing updates for suite 1104 · 98 m away
- 6416 Loyola LnAug 14, 2025Installing a new irrigation system · 178 m away
- 6400 Loyola LnSep 21, 2026Loyola lofts · 178 m away
- 6710 Loyola Lane · Loyola Project LLCJan 31, 2024Loyola lane addition — additions to existing building — new construction for one-story building addition · 211 m away
- 6708 Loyola LnAug 21, 2009Colony park retail · 239 m away
- 6710 Loyola LnMar 25, 2026Connect main water and sewer line with a grease trap connection for the building. reference 2024 030466 bp · 256 m away
- 6718 Sandshof DrJul 16, 2026Express: replace front door replace 2 tubs · 268 m away
- 6200 Loyola LnMar 2, 2007Park place apartments (smart housing) · 268 m away
- 6606 Sandshof Dr · Loyola Project, LLCSep 14, 2026Loyola religious event center — renovation/alteration — remodel of existing 4225 s.f. pemb into a religious event center with a food prep and two restrooms · 278 m away
- 6504 Sandshof DrSep 8, 2026Replacement of an existing water heater · 310 m away