6803 Breezy Hill Dr
Austin, TX 78724
Permits for solar system corrections at 6803 Breezy Hill Dr
City of Austin permits indicate work to correct and inspect a previously installed solar PV system at 6803 Breezy Hill Dr, rather than a new building. Electrical permits were filed March 3 and May 30, 2026; the later permit covers raising the existing utility meter.
Summarized from City of Austin records · updated May 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 30, 2026
- since Mar 3, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExisting utility meter is set too low. need to raise the meter
- AppliedApr 16, 2026
- IssuedMay 30, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 18, 2026
Passed final inspection Jun 18, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsExisting utility meter is set too low. need to raise the meter
Existing utility meter is set too low. need to raise the meter
City of Austin permitElectrical PermitFinal- Record
- 2026-046812 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
The previous contractor for the pv system that was installed never pulled a permit and the system was never commissioned. we are making corrections to their installation and then will need to have inspections
The previous contractor for the pv system that was installed never pulled a permit and the system was never commissioned. we are making corrections to their installation and then will need to have inspections
City of Austin permitElectrical PermitFinal- Record
- 2026-024294 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6803 Breezy Hill Dr
What is happening at 6803 Breezy Hill Dr in Austin?
City of Austin electrical permits describe corrections to a previously installed solar PV system that had not been permitted or commissioned, followed by inspections. A separate permit covers raising the existing utility meter.
Is a new building being constructed at 6803 Breezy Hill Dr?
The records provided describe electrical work at a residence, not construction of a new building. The work concerns an existing solar PV system and utility meter.
When were permits filed for the solar work at 6803 Breezy Hill Dr?
The solar-system correction permit, 2026-024294 EP, was filed March 3, 2026. Permit 2026-046812 EP, for raising the utility meter, was filed May 30, 2026.
What does permit 2026-024294 EP cover?
The March 3, 2026 City of Austin electrical permit describes correcting a previously installed PV system that had not been permitted or commissioned, then having the work inspected.
Why is the utility meter being raised at 6803 Breezy Hill Dr?
Permit 2026-046812 EP, filed May 30, 2026, says the existing utility meter was set too low and needed to be raised.
What is happening near the Garcia Ymla Outdoor Learning Project shade structure?
At 6803 Breezy Hill Dr, about 499 meters from the shade structure at 7414 Johnny Morris Road, City of Austin permits describe corrections to an existing solar PV system and raising a utility meter.
Also being built nearby
All of 78724- 7618 Northview LnSep 5, 2024Emergency repair after hours.replace burned meter blocks and 2/0 wire from load side of meter to main panel.no other work · 139 m away
- 6708 Starcrest LnMay 26, 2025Per ae the meter needs to be raised. will require shutdown · 142 m away
- 7620 Compass DrApr 30, 2025Replacement of meter and main disconnect · 202 m away
- 7759 Johnny Morris RdNov 21, 2019Sun coast resources phase ii · 218 m away
- 6605 Starcrest LnMay 29, 2024Installation of solar panels on the roof of the home · 246 m away
- 7800 Johnny Morris RdAug 26, 2026Replacement of complete existing central heat and air system with or without duct work · 268 m away
- 7401 Arctic CtJan 23, 2026Service upgrade · 327 m away
- 7335 Ritchie DrDec 17, 2025Replacement of an existing water heater · 369 m away
- 7428 Muffin DrApr 2, 2024Replacement of an existing water heater · 370 m away
- 7323 Ritchie DrDec 29, 2025Express: foundation repair (install 14 push piers) · 418 m away
- 7410 Point North CtMar 6, 2008Scenic point office / warehouse · 427 m away
- 8001 Johnny Morris RdAug 20, 2026Eplan: commercial expedited review - new construction of 5 service center bldgs. new building - pump/boat motor testing building - business & customer service space and service center for heavy duty vehicles · 450 m away
More solar installs in 78724.