groundranger
Recent · latest filing Sep 2025Residential

7609 Rio Pass

Austin, TX 78724

7609 Rio Pass: 1 project on record

City of Austin lists 1 filing across 1 project at 7609 Rio Pass, Austin, TX 78724. The most recent, filed September 8, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.

Compiled from City of Austin records · updated Sep 8, 2025

Projects
1
1 filings
Latest filing
Sep 8, 2025
since Sep 8, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedAug 11, 2025
  2. IssuedSep 8, 2025
  3. !WorkSep '25 – Mar '26
  4. Final inspection

Marked expired Mar 8, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7609 Rio Pass

What is being built at 7609 Rio Pass?

The latest filing (City of Austin permit 2025-101424 MP, September 8, 2025) covers replacement of complete existing central heat and air system with or without duct work.

How many permits and filings does 7609 Rio Pass have?

1 filing across 1 project, from September 8, 2025 to September 8, 2025.

Is there other construction near 7609 Rio Pass?

Yes. Nearby filings include 7603 Rio Pass (installing backflow device for irrigation, Sep 11, 2024); 7608 Rio Pass (replacement of an existing water heater electric 50 gallon water heater. change out 7608 rio pass austin tx 78724, Feb 24, 2026); 7514 Uray Dr (*full service upgrade to 200a. replace existing main electric panel with new 200a rated main electric panel. includes new 200a meter can. includes all new circuit breakers new whole home surge protector and updated bonding and grounding. also includes installation of a level 2 ev charger to be mounted in attached garage, Apr 28, 2026).

How do I get alerts for new permits at 7609 Rio Pass?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78724
Email me when a new permit is filed