9501 FM 969
Austin, TX 78724 · Restroom Pavilion No. 1
Metro Park Phase I includes pavilions and a nature play area
A TDLR registration describes new construction for John Trevino Jr. Metro Park Phase I at 9501 FM 969: a restroom pavilion, two manufactured shade pavilions, accessible pathways and a nature play area. The registration was filed December 31, 2025, and lists 3,278 square feet. The applicant’s estimated project cost is $6.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 31, 2025
- since Dec 31, 2025
- Largest scope
- 3,278 sf
- Estimated cost
- $6.5M
- state registration
Where this project stands
Under constructionJohn Trevino Jr. Metro Park - Phase I Development
3,278 sq ft · $6.5M est.
- RegisteredDec 31, 2025
- Plan review
- ConstructionJun '26 – Jun '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectOne restroom pavilion and two manufactured shade pavilions (3,278 sq ft) with ada accessible pathways and nature play area. — restroom pavilion no. 1
TDLR project registrationNew ConstructionReview Complete3,278 sq ft$6.5M est.- Project #
- TABS2026009118
- Tenant / owner
- John Trevino Jr. Metro Park - Phase I Development
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9501 FM 969
What is being built at 9501 FM 969 in Austin?
A TDLR project registration describes a restroom pavilion, two manufactured shade pavilions, ADA-accessible pathways and a nature play area for John Trevino Jr. Metro Park Phase I.
When was the Metro Park Phase I project registered?
The TDLR registration was filed December 31, 2025. It is listed as new construction, with review complete.
How large is the John Trevino Jr. Metro Park Phase I project?
The registration lists 3,278 square feet for the project.
What facilities are included in the Metro Park Phase I plans?
The registration describes one restroom pavilion, two manufactured shade pavilions, accessible pathways and a nature play area.
How much is the Metro Park Phase I project estimated to cost?
The applicant’s TDLR estimate for the whole project is $6.5 million; it is an estimate, not a confirmed final cost.
Is the Metro Park Phase I project approved?
The TDLR registration is marked “Review Complete.” The record describes a project registration, not a construction permit.
Also being built nearby
All of 78724- 9500 FM 969 RdJun 14, 2024Request to disconnect-electrical upgrade for solar panel installation · 40 m away
- 9501 FM 969 RdNov 9, 2026Total demolition of 1100 sq ft building circa 1959. the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 75 m away
- 9308 FM 969 Road · Endeavor Real Estate GroupMay 27, 2024Fm 969 — new construction — a 304 unit multi family apt complex with (1) 4- story wood frame structure and (6) 3- story wood frame structure. (1) 1- story club/leasing facilities with a pool court · 170 m away
- 9308 FM 969 RdNov 25, 20259308 fm 969 (sp-2023-0459d with r) · 199 m away
- 5101 Bantom Woods BndJul 30, 2024I will be installing solar panels at residential home. enphase iq8 combiner with 30 panels · 262 m away
- 5125 Bantom Woods BndJul 1, 2026Replacement of complete existing central heat and air system with or without duct work · 285 m away
- 9706 FM 969 RdJul 27, 2026[etj] burn damaged meter can base and old panel to be removed for repairs and upgrades. will replaced with a new meter loop service on the existing pole. its a 320 amp single phase service with one 200 amp & one 150amp panels. reconnect emergency connection · 302 m away
- 5101 English Glade DrNov 12, 2024Express: foundation repair · 349 m away
- 5200 Bantom Woods BndNov 9, 2026Express - foundation repair · 349 m away
- 5208 Bantom Woods BndJul 22, 2026Express- foundation repair · 364 m away
- 5129 English Glade DrApr 24, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 4 ton single stage goodman system · 365 m away
- 5100 English Glade DrJul 16, 2026Replacement of complete existing central heat and air system with or without duct work · 396 m away