3501 Ed Bluestein Blvd Nb
Austin, TX 78725
Electrical upgrades and remodel work at Austin manufacturing facility
Permits filed in 2026 cover electrical upgrades and interior remodeling at the existing manufacturing facility at 3501 Ed Bluestein Blvd Nb in Austin. The latest listed permit, 2026-127383 EP, was filed October 8, 2026, for a new load center and high-voltage switches.
Summarized from City of Austin records · updated Oct 8, 2026
- Projects
- 36
- 36 filings
- Latest filing
- Oct 8, 2026
- since Apr 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayInstallation of new load center and hvl switches for existing manufacturing facility
- AppliedSep 22, 2026
- IssuedOct 8, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
36 projectsInstallation of new load center and hvl switches for existing manufacturing facility
Installation of new load center and hvl switches for existing manufacturing facility
City of Austin permitElectrical PermitActive- Record
- 2026-127383 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of new load center and hvl switches for existing manufacturing facility
Installation of new load center and hvl switches for existing manufacturing facility
City of Austin permitBuilding PermitActive- Record
- 2026-127383 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New i-line facility panel fed from existing dist. panel fed from a 400 amp lja36400u43x i-line breaker
New i-line facility panel fed from existing dist. panel fed from a 400 amp lja36400u43x i-line breaker
City of Austin permitElectrical PermitFinal- Record
- 2026-088502 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing lt manufacturing areas
Interior remodel to existing lt manufacturing areas
City of Austin permitElectrical PermitActive- Record
- 2026-029434 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 100 amp panel from existing branch distribution panel
Install new 100 amp panel from existing branch distribution panel
City of Austin permitElectrical PermitFinal- Record
- 2026-041771 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing lt manufacturing areas
Interior remodel to existing lt manufacturing areas
City of Austin permitBuilding PermitActive- Record
- 2026-029434 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 480v electrical panel to feed new heater jackets for 6 generator s
Install new 480v electrical panel to feed new heater jackets for 6 generator s
City of Austin permitElectrical PermitFinal- Record
- 2025-106520 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of any self-contained packaged units
Replacement of any self-contained packaged units
City of Austin permitMechanical PermitExpired- Record
- 2025-119557 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
City of Austin permitElectrical PermitFinal- Record
- 2025-102930 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
City of Austin permitElectrical PermitFinal- Record
- 2025-102929 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
City of Austin permitMechanical PermitFinal- Record
- 2025-102929 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
City of Austin permitMechanical PermitFinal- Record
- 2025-102930 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Ep for a ups flywheel install (separate from the hydrogen electrolysis project in the same building)
Ep for a ups flywheel install (separate from the hydrogen electrolysis project in the same building)
City of Austin permitElectrical PermitExpired- Record
- 2025-075358 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
City of Austin permitBuilding PermitActive- Record
- 2025-102929 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)
City of Austin permitBuilding PermitActive- Record
- 2025-102930 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z
Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z
City of Austin permitElectrical PermitFinal- Record
- 2025-093514 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z
Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z
City of Austin permitBuilding PermitFinal- Record
- 2025-093514 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z
Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z
City of Austin permitMechanical PermitFinal- Record
- 2025-093514 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)
Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)
City of Austin permitMechanical PermitFinal- Record
- 2024-149552 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)
Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)
City of Austin permitPlumbing PermitFinal- Record
- 2024-149552 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)
Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)
City of Austin permitElectrical PermitFinal- Record
- 2024-149552 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)
Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)
City of Austin permitBuilding PermitFinal- Record
- 2024-149552 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Add 75 kva xfmr pri/sec switches + 225a 208-120v panel per ec billy hanson repair no other trade jobs being performed
Add 75 kva xfmr pri/sec switches + 225a 208-120v panel per ec billy hanson repair no other trade jobs being performed
City of Austin permitElectrical PermitFinal- Record
- 2024-096918 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new equipment lift
Install new equipment lift
City of Austin permitElectrical PermitFinal- Record
- 2024-072551 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new equipment lift
Install new equipment lift
City of Austin permitBuilding PermitFinal- Record
- 2024-072551 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)
Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)
City of Austin permitPlumbing PermitFinal- Record
- 2023-129873 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)
Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)
City of Austin permitPlumbing PermitFinal- Record
- 2023-129874 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Add 2 - 225 kva xfmrs with pri / sec switches with 800 amp i-line panels
Add 2 - 225 kva xfmrs with pri / sec switches with 800 amp i-line panels
City of Austin permitElectrical PermitFinal- Record
- 2024-059453 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)
Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)
City of Austin permitMechanical PermitFinal- Record
- 2023-129874 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)
Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)
City of Austin permitMechanical PermitFinal- Record
- 2023-129873 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)
Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)
City of Austin permitMechanical PermitFinal- Record
- 2023-115062 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)
Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)
City of Austin permitPlumbing PermitFinal- Record
- 2023-115062 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)
Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)
City of Austin permitElectrical PermitFinal- Record
- 2023-129873 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)
Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)
City of Austin permitElectrical PermitFinal- Record
- 2023-129874 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)
Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)
City of Austin permitBuilding PermitFinal- Record
- 2023-115062 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)
Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)
City of Austin permitElectrical PermitFinal- Record
- 2023-115062 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3501 Ed Bluestein Blvd Nb
What is being built at 3501 Ed Bluestein Blvd Nb?
The permits describe electrical upgrades and interior remodel work at an existing manufacturing facility, not a new building. The latest listed work is a new load center and high-voltage switches.
When were permits filed for work at 3501 Ed Bluestein Blvd Nb?
The records span August 6, 2025, through October 8, 2026. The latest listed permit is 2026-127383 EP, filed October 8, 2026.
What does permit 2026-127383 cover in Austin?
Permit 2026-127383 EP, filed October 8, 2026, covers installation of a new load center and high-voltage switches for the existing manufacturing facility. A related building permit, 2026-127383 BP, was filed October 5, 2026.
Is a new manufacturing facility being built at 3501 Ed Bluestein Blvd Nb?
The listed permits describe work at an existing manufacturing facility, including interior remodeling and electrical upgrades. They do not describe construction of a new facility.
What interior remodeling is permitted at 3501 Ed Bluestein Blvd Nb?
A building permit filed March 12, 2026, describes an interior remodel to existing manufacturing areas. Related electrical permit 2026-029434 EP was filed July 28, 2026.
How large is the manufacturing building at 3501 Ed Bluestein Blvd Nb?
Some September 2025 permit descriptions refer to an interior remodel of an existing manufacturing building listed as 220,000 square feet. The record sheet does not provide a separate verified building-area figure.