groundranger
Active · latest filing Oct 2026Commercial

3501 Ed Bluestein Blvd Nb

Austin, TX 78725

Electrical upgrades and remodel work at Austin manufacturing facility

Permits filed in 2026 cover electrical upgrades and interior remodeling at the existing manufacturing facility at 3501 Ed Bluestein Blvd Nb in Austin. The latest listed permit, 2026-127383 EP, was filed October 8, 2026, for a new load center and high-voltage switches.

Summarized from City of Austin records · updated Oct 8, 2026

Projects
36
36 filings
Latest filing
Oct 8, 2026
since Apr 29, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Installation of new load center and hvl switches for existing manufacturing facility

  1. AppliedSep 22, 2026
  2. IssuedOct 8, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
24% through of the permit windowOct 8, 2026 → Apr 4, 2027

1 contact on this project · 1 phone number

Permit & project history

36 projects
  1. Installation of new load center and hvl switches for existing manufacturing facility

    Installation of new load center and hvl switches for existing manufacturing facility

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of new load center and hvl switches for existing manufacturing facility

    Installation of new load center and hvl switches for existing manufacturing facility

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. New i-line facility panel fed from existing dist. panel fed from a 400 amp lja36400u43x i-line breaker

    New i-line facility panel fed from existing dist. panel fed from a 400 amp lja36400u43x i-line breaker

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Interior remodel to existing lt manufacturing areas

    Interior remodel to existing lt manufacturing areas

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Install new 100 amp panel from existing branch distribution panel

    Install new 100 amp panel from existing branch distribution panel

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Interior remodel to existing lt manufacturing areas

    Interior remodel to existing lt manufacturing areas

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Install new 480v electrical panel to feed new heater jackets for 6 generator s

    Install new 480v electrical panel to feed new heater jackets for 6 generator s

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Replacement of any self-contained packaged units

    Replacement of any self-contained packaged units

    City of Austin permitMechanical PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Ep for a ups flywheel install (separate from the hydrogen electrolysis project in the same building)

    Ep for a ups flywheel install (separate from the hydrogen electrolysis project in the same building)

    City of Austin permitElectrical PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    Eplan: commercial expedited review - interior remodel to existing manufacturing building (220000 sq ft)

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z

    Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z

    Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z

    Installation of hydrogen electrolysis units in fan deck area on level 3 of building x. piping will be routed from the fan deck to level 1 of building y and levels 1 and 2 of building z

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)

    Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  20. Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)

    Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  21. Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)

    Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  22. Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)

    Eplan: expedited review - interior remodel and addition to an existing manufacturing facility (6603 sq ft)

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  23. Add 75 kva xfmr pri/sec switches + 225a 208-120v panel per ec billy hanson repair no other trade jobs being performed

    Add 75 kva xfmr pri/sec switches + 225a 208-120v panel per ec billy hanson repair no other trade jobs being performed

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  24. Install new equipment lift

    Install new equipment lift

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  25. Install new equipment lift

    Install new equipment lift

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  26. Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)

    Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  27. Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)

    Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  28. Add 2 - 225 kva xfmrs with pri / sec switches with 800 amp i-line panels

    Add 2 - 225 kva xfmrs with pri / sec switches with 800 amp i-line panels

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  29. Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)

    Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  30. Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)

    Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  31. Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)

    Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  32. Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)

    Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  33. Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)

    Eplan-expedited review: remodel to existing manufacturing facility. phase 1 on 1st floor (2656 sq ft)

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  34. Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)

    Eplan-expedited review: remodel to existing manufacturing facility. phase 2 on 2nd floor. (4057 sq ft)

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  35. Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)

    Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  36. Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)

    Eplan: expedited review - interior remodel to an existing semiconductor manufacturing facility 1st floor (6205 sq ft)

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3501 Ed Bluestein Blvd Nb

What is being built at 3501 Ed Bluestein Blvd Nb?

The permits describe electrical upgrades and interior remodel work at an existing manufacturing facility, not a new building. The latest listed work is a new load center and high-voltage switches.

When were permits filed for work at 3501 Ed Bluestein Blvd Nb?

The records span August 6, 2025, through October 8, 2026. The latest listed permit is 2026-127383 EP, filed October 8, 2026.

What does permit 2026-127383 cover in Austin?

Permit 2026-127383 EP, filed October 8, 2026, covers installation of a new load center and high-voltage switches for the existing manufacturing facility. A related building permit, 2026-127383 BP, was filed October 5, 2026.

Is a new manufacturing facility being built at 3501 Ed Bluestein Blvd Nb?

The listed permits describe work at an existing manufacturing facility, including interior remodeling and electrical upgrades. They do not describe construction of a new facility.

What interior remodeling is permitted at 3501 Ed Bluestein Blvd Nb?

A building permit filed March 12, 2026, describes an interior remodel to existing manufacturing areas. Related electrical permit 2026-029434 EP was filed July 28, 2026.

How large is the manufacturing building at 3501 Ed Bluestein Blvd Nb?

Some September 2025 permit descriptions refer to an interior remodel of an existing manufacturing building listed as 220,000 square feet. The record sheet does not provide a separate verified building-area figure.

More warehouses & industrial in 78725.

Email me when it passes final inspection