7012 Hester Rd
Austin, TX 78725
Gas line and water heater work permitted at 7012 Hester Rd
A City of Austin permit dated March 18, 2026, covers emergency gas and plumbing work at the home at 7012 Hester Rd. The work includes a new gas line, a 50-gallon water heater, and replacement water-line fixtures.
Summarized from City of Austin records · updated Mar 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 18, 2026
- since Mar 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectEmergency request - home without services pulled gas meter and gas pressure test to home. install new gas line from gas meter through attic to three gas appliances in home. install new 50 gallon gas water heater. install new homeowner valve and prv on main water line
Emergency request - home without services pulled gas meter and gas pressure test to home. install new gas line from gas meter through attic to three gas appliances in home. install new 50 gallon gas water heater. install new homeowner valve and prv on main water line
City of Austin permitPlumbing PermitFinal- Record
- 2026-033063 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7012 Hester Rd
What work is being done at 7012 Hester Rd?
The City of Austin permit covers installing a gas line to three gas appliances, a 50-gallon water heater, and a homeowner valve and pressure-reducing valve on the main water line.
Is a new home being built at 7012 Hester Rd?
The permit record describes emergency gas and plumbing work at a home, not new home construction.
When was the permit filed for 7012 Hester Rd?
The City of Austin filed plumbing permit 2026-033063 PP on March 18, 2026. Its listed status is Final.
Why was work permitted at 7012 Hester Rd?
The permit description says the request was an emergency because the home was without services.
Does the 7012 Hester Rd permit include a new water heater?
Yes. The permit describes installation of a new 50-gallon gas water heater.
Also being built nearby
All of 78725- 7004 Hester RdJan 3, 2025Replacement of complete existing central heat and air system with or without duct work located in hall closet · 39 m away
- 2613 Kingsland WaySep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 55 m away
- 6601 Alleyton DrSep 10, 2024Ev install · 77 m away
- 6605 Alleyton DrOct 19, 2026Base: installing a backup battery system and additional meter socket · 79 m away
- 6613 Alleyton DrJan 3, 2025Replacement of complete existing central heat and air system with or without duct work residential changeout · 85 m away
- 6617 Alleyton DrMar 25, 2024Installation of irrigation system · 88 m away
- 6517-1/2 Alleyton DrAug 5, 2026Resubdivision of knollwood on colorado river section 2b lot 13 blk b · 91 m away
- 2509 Winchell LnJul 1, 2024Replacement of an existing water heater · 121 m away
- 2712 Kingsland WayAug 13, 202512.15kw photovoltaic system (x30) rec 405w modules (x8) hoymiles hm-1500 micro inverters · 127 m away
- 2517 Winchell LnMar 31, 2025Replacement of an existing water heater replace 40gal gas water heater · 127 m away
- 2509 Highland Haven DrMay 11, 2026(gaskill mel) - installation of circuit for elec. vehicle charging station - esip · 138 m away
- 2609 Highland Haven DrApr 2, 2025Replacement of complete existing central heat and air system with or without duct work · 142 m away