EV charger circuit permitted at 10748 Bramblecrest Dr

A new 50-amp circuit and EV charger are planned at this Austin residence, according to an electrical permit filed August 5, 2026. The permit describes a NEMA 14-50 receptacle and says the charger will draw up to 40 amps continuously.

Summarized from City of Austin records · updated Aug 5, 2026

Projects
3
3 filings
Latest filing
Aug 5, 2026
since Mar 22, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

We will install a new 50a gfci circuit in the 200a msp. we will route the wiring directly behind the main panel through a surface-mounted conduit to the back interior garage wall and install the nema 14-50 in an indoor-rated nema receptacle cover and box. the charger will be installed on a 50a circuit and will draw up to 40a continuous

  1. AppliedAug 3, 2026
  2. IssuedAug 5, 2026
  3. WorkAug '26 – Aug '26
  4. Final inspectionAug 14, 2026

Passed final inspection Aug 14, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. We will install a new 50a gfci circuit in the 200a msp. we will route the wiring directly behind the main panel through a surface-mounted conduit to the back interior garage wall and install the nema 14-50 in an indoor-rated nema receptacle cover and box. the charger will be installed on a 50a circuit and will draw up to 40a continuous

    We will install a new 50a gfci circuit in the 200a msp. we will route the wiring directly behind the main panel through a surface-mounted conduit to the back interior garage wall and install the nema 14-50 in an indoor-rated nema receptacle cover and box. the charger will be installed on a 50a circuit and will draw up to 40a continuous

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of two existing water heaters and prv in yard

    Replacement of two existing water heaters and prv in yard

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Express - replace 42 windows like for like

    Express - replace 42 windows like for like

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 10748 Bramblecrest Dr

What is being installed at 10748 Bramblecrest Dr?

A City of Austin electrical permit describes a new 50-amp circuit and an EV charger at the residence. The charger is specified to draw up to 40 amps continuously.

When was the EV charger permit filed?

The electrical permit was filed August 5, 2026. Its permit number is 2026-100420 EP.

What kind of outlet is planned at 10748 Bramblecrest Dr?

The permit describes a NEMA 14-50 receptacle in an indoor-rated cover and box, connected to a new 50-amp GFCI circuit.

Is the EV charger installation complete?

The City of Austin permit record is marked Final. It describes installation of the circuit and charger.

What other work has been permitted at this address?

Records also show replacement of two water heaters and a yard pressure-reducing valve under plumbing permit 2024-034933 PP, filed March 22, 2024. A 2023 building permit covered like-for-like replacement of 42 windows.