groundranger
Recent · latest filing Jan 2026Residential

10911 Enchanted Rock Cv

Austin, TX 78726

Electrical service upgrade at 10911 Enchanted Rock Cv

An electrical permit indicates an upgrade from a 125-amp to a 200-amp main service panel at this Austin home. The permit was filed January 2, 2026, and is listed as final.

Summarized from City of Austin records · updated Jan 2, 2026

Projects
1
1 filings
Latest filing
Jan 2, 2026
since Jan 2, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Will be upgrading from 125amp to 200amp main service panel. will be pulling new 2/0 copper conductors from the meter to meet ampacity requirements and installing 200 amp breakers at the meter pedestal and main panel to meet protection requirements

  1. AppliedDec 30, 2025
  2. IssuedJan 2, 2026
  3. WorkJan '26 – Jan '26
  4. Final inspectionJan 9, 2026

Passed final inspection Jan 9, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Will be upgrading from 125amp to 200amp main service panel. will be pulling new 2/0 copper conductors from the meter to meet ampacity requirements and installing 200 amp breakers at the meter pedestal and main panel to meet protection requirements

    Will be upgrading from 125amp to 200amp main service panel. will be pulling new 2/0 copper conductors from the meter to meet ampacity requirements and installing 200 amp breakers at the meter pedestal and main panel to meet protection requirements

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 10911 Enchanted Rock Cv

What work is planned at 10911 Enchanted Rock Cv?

An Austin permit describes upgrading the main electrical service panel from 125 amps to 200 amps and installing new conductors and breakers.

Is a new home being built at 10911 Enchanted Rock Cv?

The available record is for an electrical service upgrade, not a new-home construction permit.

When was the electrical permit filed?

The City of Austin permit, 2025-163338 EP, was filed January 2, 2026.

What is the status of permit 2025-163338 EP?

The City of Austin record lists the electrical permit as final.

Why is the electrical service being upgraded?

The permit description says the new conductors are to meet ampacity requirements and the breakers are to meet protection requirements.

Also being built nearby

All of 78726
Email me when a new permit is filed