8233 Phantom Canyon Dr
Austin, TX 78726
30-foot tunnel permitted for sewer repairs under Austin home
A 30-foot tunnel under the home at 8233 Phantom Canyon Dr is planned to make sewer system repairs. The City of Austin issued plumbing permit 2026-045475 PP on April 15, 2026; its status is listed as Final.
Summarized from City of Austin records · updated Apr 15, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 15, 2026
- since Apr 15, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel 30 ft under home to make repairs on sewer system
- AppliedApr 14, 2026
- IssuedApr 15, 2026
- WorkApr '26 – Apr '26
- Final inspectionApr 28, 2026
Passed final inspection Apr 28, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel 30 ft under home to make repairs on sewer system
Tunnel 30 ft under home to make repairs on sewer system
City of Austin permitPlumbing PermitFinal- Record
- 2026-045475 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8233 Phantom Canyon Dr
What is being built at 8233 Phantom Canyon Dr?
A 30-foot tunnel under the home to make repairs on the sewer system, according to City of Austin plumbing permit 2026-045475 PP.
Is a new home being built at 8233 Phantom Canyon Dr?
The permit record describes a tunnel under the home for sewer system repairs, not construction of a new home.
When was the sewer repair permit issued for 8233 Phantom Canyon Dr?
The City of Austin permit is dated April 15, 2026.
What is the permit number for work at 8233 Phantom Canyon Dr?
The permit number is 2026-045475 PP. It is listed as a plumbing permit with Final status.
How long is the tunnel planned at 8233 Phantom Canyon Dr?
The permit description says the tunnel will extend 30 feet under the home.
Also being built nearby
All of 78726- 8216 Endeavor CirJan 27, 2025Replacement of an existing water heater replacing 2 gas tank type water heaters like for like · 37 m away
- 12624 Alberta Ridge TrlDec 16, 2025Express - change front slope roof material to metal from shingles. decking replacement during installation more than 128 ft required · 50 m away
- 8236 Phantom Canyon DrJan 16, 2024Express: tub to shower conversion (not relocating plumbing fixtures) · 59 m away
- 8221 Phantom Canyon DrJun 25, 2026Replacement of an existing water heater · 73 m away
- 12600 Alberta Ridge TrlJul 13, 2026Addition- screened-in porch addition · 127 m away
- 8212 Phantom Canyon DrOct 6, 2026Trench/ run 8 of poly to generator · 129 m away
- 8108 Sebastapol CvJan 8, 2026Express - remove and replacing 2 windows · 147 m away
- 12505 Verandah CtJul 22, 2025Express - replace 2 windows like for like · 150 m away
- 12512 Verandah CtDec 20, 2007Grandview hills sec 8, amended plat of lots of 11, 12 & 15, block a — grandview hills sec 8, amended plat of lots of 11, 12 & 15, block a · 152 m away
- 12506 Verandah CtOct 13, 2026Ev charger installation: proposed installation plan: use pre-wired 60a 240v circuit from the 125a subpanel hardwire the rivian wall charger on the interior left side wall of the garage next to the subpanel replacing the existing charger and configure to draw up to 48a continuous · 168 m away
- 8113 Sebastapol CvAug 7, 2026Replacement of an existing water heater · 169 m away
- 12512 Alberta Ridge TrlJan 16, 2024Replacement of an existing water heater · 174 m away