9405 Epic Ct
Austin, TX 78726
9405 Epic Ct: 1 project on record
City of Austin lists 1 filing across 1 project at 9405 Epic Ct, Austin, TX 78726. The most recent, filed October 16, 2025, covers: “Replacement of an existing water heater replace existing 40 gallon natural gas water heater in second story attic with current equivalent”.
Compiled from City of Austin records · updated Oct 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 16, 2025
- since Oct 16, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater replace existing 40 gallon natural gas water heater in second story attic with current equivalent
- AppliedOct 9, 2025
- IssuedOct 16, 2025
- WorkOct '25 – Mar '26
- Final inspectionMar 23, 2026
Passed final inspection Mar 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater replace existing 40 gallon natural gas water heater in second story attic with current equivalent
Replacement of an existing water heater replace existing 40 gallon natural gas water heater in second story attic with current equivalent
City of Austin permitPlumbing PermitFinal- Record
- 2025-131341 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9405 Epic Ct
What is being built at 9405 Epic Ct?
The latest filing (City of Austin permit 2025-131341 PP, October 16, 2025) covers replacement of an existing water heater replace existing 40 gallon natural gas water heater in second story attic with current equivalent.
How many permits and filings does 9405 Epic Ct have?
1 filing across 1 project, from October 16, 2025 to October 16, 2025.
Is there other construction near 9405 Epic Ct?
Yes. Nearby filings include 9413 Epic Ct (ev charger install: proposed installation plan: install a new 60a circuit in the 100a subpanel and route wiring through surface-mounted conduit along the interior garage walls and ceiling to the left wall hardwire the rivian wall charger and configure to draw up to 48a continuous, Oct 16, 2026); 11504 Tibee Dr (replacement of an existing water heater change out of two 50gal gas water heaters with two 40gal gas water heaters in attic, Oct 1, 2026); 9501 Savannah Ridge Dr (24kw whole home generator (natural gas) connected to house meter and main panel. pec disconnect required. (rich dutton), Nov 26, 2024).
How do I get alerts for new permits at 9405 Epic Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78726- 9413 Epic CtOct 16, 2026Ev charger install: proposed installation plan: install a new 60a circuit in the 100a subpanel and route wiring through surface-mounted conduit along the interior garage walls and ceiling to the left wall hardwire the rivian wall charger and configure to draw up to 48a continuous · 39 m away
- 11504 Tibee DrOct 1, 2026Replacement of an existing water heater change out of two 50gal gas water heaters with two 40gal gas water heaters in attic · 114 m away
- 9501 Savannah Ridge DrNov 26, 202424kw whole home generator (natural gas) connected to house meter and main panel. pec disconnect required. (rich dutton) · 119 m away
- 9500 Aire Libre DrApr 30, 2024New pool with concrete deck · 141 m away
- 9400 Jenaro CtJul 16, 2026Ev charger installation: install a new 60-amp circuit in the 100 subanel and route wiring left /right of the panel to the interior side wall of the garage... hardwire the charge point home flex- j1772 and configure to draw up 48 amp continuous · 145 m away
- 9504 Aire Libre DrOct 30, 2026Replacement of complete existing central heat and air system with or without duct work · 146 m away
- 9550 Savannah Ridge DrNov 9, 2026Replacement of complete existing central heat and air system with or without duct work · 153 m away
- 9432 Jenaro CtNov 7, 2025Replacement of an existing water heater · 180 m away
- 9505 Aire Libre DrJul 7, 2025Express: window replacement · 182 m away
- 11425 Dona Villa DrJun 2, 2025We are replacing water lines no tunneling needed. whole house water line repipe and outside yard line. job description: estimate for a whole house water line repipe. customer currently has kitec for water piping throughout the house. due to kitec fittings and piping plumber is unable to reconnect to water piping. customer has 2 full bathrooms kitchen sink laundry room hose faucet and utility sink in the garage. plumber will need to reroute water lines through attic access. multiple cuts in sheetrock behind fixtures will need to be accessed to reconnect each fixture · 261 m away
- 11413 Dona Villa DrFeb 22, 2024Replacement of an existing water heater · 280 m away
- 9601 Corbe DrJul 19, 2024Replacement of an existing water heater · 353 m away