9600 Aire Libre Dr

Austin, TX 78726

5.22-kW residential solar system tie-in permitted

An electrical permit indicates work to connect photovoltaic and energy storage components at 9600 Aire Libre Dr. The permit was filed on July 10, 2026, and describes a 5.22-kW system. It says the service and meter sizes are not being upgraded.

Summarized from City of Austin records · updated Jul 10, 2026

Projects
1
1 filings
Latest filing
Jul 10, 2026
since Jul 10, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size. 5.22kw system

  1. AppliedJul 8, 2026
  2. IssuedJul 10, 2026
  3. WorkJul '26 – Jan '27
  4. Final inspection
73% through of the permit windowJul 10, 2026 → Jan 6, 2027

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size. 5.22kw system

    Disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size. 5.22kw system

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9600 Aire Libre Dr

What is being built at 9600 Aire Libre Dr?

An Austin electrical permit indicates work to connect photovoltaic and energy storage components for a 5.22-kW system. The filing does not specify an energy storage capacity.

Is solar being installed at 9600 Aire Libre Dr in Austin?

The July 10, 2026 permit describes disconnecting and reconnecting electrical service to tie in photovoltaic and energy storage components for a 5.22-kW system.

When was the solar permit filed for 9600 Aire Libre Dr?

The City of Austin filed permit 2026-087654 EP on July 10, 2026.

Does the work at 9600 Aire Libre Dr include an electrical service upgrade?

No. Permit 2026-087654 EP says the service size and meter size are not being upgraded.

How large is the solar system planned for 9600 Aire Libre Dr?

The City of Austin permit describes a 5.22-kW system. It does not list a project cost.