Electrical service upgrade permitted at 12022 Carmel Park Ln

An electrical permit at 12022 Carmel Park Ln covers replacing the existing electrical panel and meter base and upgrading service to 200 amps. The City of Austin permit was filed May 26, 2026, and is listed as final.

Summarized from City of Austin records · updated May 26, 2026

Projects
1
1 filings
Latest filing
May 26, 2026
since May 26, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

We will replace the old split bus main panel that needs to be replaced because they are a known issue. we will upgrade the service to a 200 amp main breaker using 4/0 aluminum wire between the meter base and the panel. we will replace the meter base to meet austin energy requirements. we will add in surge protection two ground rods and bond the gas line and waterline to the main panel to meet current code

  1. AppliedMay 21, 2026
  2. IssuedMay 26, 2026
  3. WorkMay '26 – Jun '26
  4. Final inspectionJun 16, 2026

Passed final inspection Jun 16, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. We will replace the old split bus main panel that needs to be replaced because they are a known issue. we will upgrade the service to a 200 amp main breaker using 4/0 aluminum wire between the meter base and the panel. we will replace the meter base to meet austin energy requirements. we will add in surge protection two ground rods and bond the gas line and waterline to the main panel to meet current code

    We will replace the old split bus main panel that needs to be replaced because they are a known issue. we will upgrade the service to a 200 amp main breaker using 4/0 aluminum wire between the meter base and the panel. we will replace the meter base to meet austin energy requirements. we will add in surge protection two ground rods and bond the gas line and waterline to the main panel to meet current code

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 12022 Carmel Park Ln

What work is being done at 12022 Carmel Park Ln?

A City of Austin electrical permit covers replacing the existing panel and meter base and upgrading the service to 200 amps.

When was the electrical permit for 12022 Carmel Park Ln filed?

The permit, 2026-064793 EP, was filed May 26, 2026.

Is 12022 Carmel Park Ln a new construction project?

The permit describes electrical work at an existing residence, including replacing the panel and meter base. It does not describe new construction.

What does the electrical work at 12022 Carmel Park Ln include?

The permit describes a 200-amp service upgrade, new wiring between the meter base and panel, surge protection, two ground rods, and bonding the gas and water lines to the panel.

What is the status of permit 2026-064793 EP?

The City of Austin lists the electrical permit as final. It was filed May 26, 2026.