12207 Brigadoon Ln
Austin, TX 78727 · Austin Independent School District
Summit Elementary security entry work and walk-in replacement
Permits indicate work at Summit Elementary includes a secure vestibule and reception-area changes, followed by replacement of a walk-in and its refrigeration system. The security and reception work was permitted between April and May 2025; the walk-in replacement permit was filed June 11, 2026.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jun 11, 2026
- Projects
- 12
- 12 filings
- Latest filing
- Jun 11, 2026
- since Mar 2, 2007
- Largest scope
- 2,857 sf
- Estimated cost
- $801K
- state registration
Where this project stands
FinaledLike for like* remove existing walk-in and install new walk-in and install the refrigeration system
- AppliedJun 10, 2026
- IssuedJun 11, 2026
- WorkJun '26 – Aug '26
- Final inspectionAug 7, 2026
Passed final inspection Aug 7, 2026.
1 contact on this project · 1 phone number
Permit & project history
12 projectsLike for like* remove existing walk-in and install new walk-in and install the refrigeration system
Like for like* remove existing walk-in and install new walk-in and install the refrigeration system
City of Austin permitMechanical PermitFinal- Record
- 2026-074111 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Enclosing existing corridor to create secure vestibule securing new reception area to add control over access to interior of school addition of security hardware to new vestibule space and reception reconfiguration of admonistrative spaces to separate wing of school
Enclosing existing corridor to create secure vestibule securing new reception area to add control over access to interior of school addition of security hardware to new vestibule space and reception reconfiguration of admonistrative spaces to separate wing of school
City of Austin permitMechanical PermitFinal- Record
- 2025-031111 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Enclosing existing corridor to create secure vestibule securing new reception area to add control over access to interior of school addition of security hardware to new vestibule space and reception reconfiguration of admonistrative spaces to separate wing of school
Enclosing existing corridor to create secure vestibule securing new reception area to add control over access to interior of school addition of security hardware to new vestibule space and reception reconfiguration of admonistrative spaces to separate wing of school
City of Austin permitPlumbing PermitFinal- Record
- 2025-031111 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Enclosing existing corridor to create secure vestibule securing new reception area to add control over access to interior of school addition of security hardware to new vestibule space and reception reconfiguration of admonistrative spaces to separate wing of school
Enclosing existing corridor to create secure vestibule securing new reception area to add control over access to interior of school addition of security hardware to new vestibule space and reception reconfiguration of admonistrative spaces to separate wing of school
City of Austin permitElectrical PermitFinal- Record
- 2025-031111 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Enclosing existing corridor to create secure vestibule securing new reception area to add control over access to interior of school addition of security hardware to new vestibule space and reception reconfiguration of admonistrative spaces to separate wing of school
Enclosing existing corridor to create secure vestibule securing new reception area to add control over access to interior of school addition of security hardware to new vestibule space and reception reconfiguration of admonistrative spaces to separate wing of school
City of Austin permitBuilding PermitFinal- Record
- 2025-031111 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Creating secure vestibule, securing new reception area, addition of security hardware to new vestibule space and reception, reconfiguration of admonistrative spaces to separate wing of school. — summitt elementary school
TDLR project registrationRenovation/AlterationProject Closed2,857 sq ft$801K est.- Project #
- TABS2025000066
- Tenant / owner
- Secure Vestibule At Summitt Elementary School
- Design firm
- Pro
- Contact
- Pro
New and replacement water source heat pumps and fluid cooler repair at existing school
New and replacement water source heat pumps and fluid cooler repair at existing school
City of Austin permitMechanical PermitFinal- Record
- 2023-028712 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 12207 Brigadoon Ln
What is being built at 12207 Brigadoon Ln in Austin?
City of Austin permits describe changes to a school entry and reception area, including a secure vestibule, plus replacement of an existing walk-in and refrigeration system. The records identify renovations at Summit Elementary.
Is a new school being built at 12207 Brigadoon Ln?
The records describe renovations and equipment replacement at Summit Elementary, not construction of a new school. Earlier city cases also refer to portable classrooms and school renovations.
What security work is planned at Summit Elementary?
Permits describe enclosing an existing corridor to create a secure vestibule, securing a new reception area, adding security hardware, and reconfiguring administrative spaces. The building permit, 2025-031111 BP, was filed April 7, 2025.
When was the Summit Elementary entry work permitted?
The building permit was filed April 7, 2025, and the electrical permit was filed May 6, 2025. Mechanical and plumbing permits followed on May 16, 2025.
What is the latest permit for 12207 Brigadoon Ln?
The latest listed permit, 2026-074111 MP, was filed June 11, 2026. It describes removing an existing walk-in and installing a replacement walk-in and refrigeration system; its status is Final.
What do the older permits say about Summit Elementary?
City of Austin cases from 2009 describe renovations to Summit Elementary, including cases approved and released on July 15 and November 12, 2009. Two 2007 cases refer to portable classrooms.
Also being built nearby
All of 78727- 12237 Mosley LnJan 24, 2024Replacement of an existing water heater · 127 m away
- 12219 Mosley LnJun 11, 202540gal gas water heater changeout prv · 128 m away
- 3802 Tattershall LnMar 5, 2024Express: tub to tub conversions in 2 bathrooms (not relocating plumbing or changing layout · 138 m away
- 3813 Cologne LnFeb 2, 2024Installation of solar panels · 154 m away
- 12212 Brigadoon LnSep 29, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 161 m away
- 12216 Grimsley DrJul 21, 2026Replacement of an existing water heater · 170 m away
- 3809 Tattershall LnApr 14, 2025Emergency permit replace failed 125 amp main panel ***emergency inspection done on 3/28/25-hyatt · 181 m away
- 3903 Tattershall LnSep 24, 2026Interior kitchen wall to be removed to maximize open space · 200 m away
- 3836 Cologne LnAug 23, 2024Rebuild service entrance; replace damaged main panel · 218 m away
- 3838 Cologne LnMar 12, 2024Install automatic irrigation system using city potable water · 221 m away
- 3609 Tyrone DrJun 4, 2026Replacement of complete existing central heat and air system with or without duct work · 225 m away
- 12219 Grimsley DrJul 11, 2025Replacement of an existing water heater standard 40 gal electric water heater change out 12219 grimsley drive austin tx 78759 · 230 m away