groundranger
Recent · latest filing Aug 2026Residential

12407 West Cow Path

Austin, TX 78727

Solar, battery storage and backup system permits at 12407 West Cow Path

City of Austin permits show a 15.3-kW rooftop solar system and 13.5-kW energy storage system for an existing residence, filed October 9, 2025. That permit is expired. A separate permit filed August 18, 2026, for a backup battery system and additional meter socket is active.

Summarized from City of Austin records · updated Aug 18, 2026

Projects
3
3 filings
Latest filing
Aug 18, 2026
since Oct 6, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedAug 7, 2026
  2. IssuedAug 18, 2026
  3. WorkAug '26 – Feb '27
  4. Final inspection
52% through of the permit windowAug 18, 2026 → Feb 14, 2027

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 15.300 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    Install new 15.300 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    City of Austin permitElectrical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Disconnect/reconnect to upgrade main distribution panel

    Disconnect/reconnect to upgrade main distribution panel

    City of Austin permitElectrical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 12407 West Cow Path

What is being installed at 12407 West Cow Path?

Austin permit records show a rooftop solar system, energy storage system and a separately permitted backup battery system with an additional meter socket. The solar and storage permit describes the work as for an existing residence.

When was the solar system permit filed at 12407 West Cow Path?

Permit 2025-125835 EP was filed October 9, 2025, for a 15.3-kW rooftop solar system and 13.5-kW energy storage system. Its status is expired.

Is the battery system permit at 12407 West Cow Path active?

Yes. City of Austin permit 2026-103218 EP, filed August 18, 2026, is active and describes installing a backup battery system and additional meter socket.

Was electrical panel work also permitted at 12407 West Cow Path?

Yes. Permit 2025-125874 EP, filed October 6, 2025, covers disconnecting and reconnecting equipment to upgrade the main distribution panel. Its status is expired.

Is this a new home or a solar installation at an existing residence?

The October 2025 solar permit describes the work as a solar and energy storage installation for an existing residence. The records provided do not describe construction of a new home.

What is being permitted near Ara Mso, LLC Riata Center?

At 12407 West Cow Path, about 295 meters from Ara Mso, LLC Riata Center, Austin records show residential solar and energy storage work, plus an active permit for a backup battery system and additional meter socket.

Also being built nearby

All of 78727

More warehouses & industrial in 78727, solar installs in 78727.

Email me when it passes final inspection