Austin residence gets shower and electrical upgrades
Permits indicate shower pan and valve replacement at this Austin residence, filed June 8, 2026. An electrical permit filed December 18, 2024, covered an upgrade to 200-amp service and a new meter can.
Summarized from City of Austin records · updated Jun 8, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 8, 2026
- since Dec 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: shower pan and valve replacement
- AppliedJun 8, 2026
- IssuedJun 8, 2026
- WorkJun '26 – Jul '26
- Final inspectionJul 2, 2026
Passed final inspection Jul 2, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
3 projectsExpress: shower pan and valve replacement
Express: shower pan and valve replacement
City of Austin permitBuilding PermitFinal- Record
- 2026-072422 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: shower pan and valve replacement
Express: shower pan and valve replacement
City of Austin permitPlumbing PermitFinal- Record
- 2026-072422 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
200 amp service upgrade new 200 amp meter can
200 amp service upgrade new 200 amp meter can
City of Austin permitElectrical PermitFinal- Record
- 2024-160245 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12803 Powderhorn St
What is being built at 12803 Powderhorn St?
The permits listed do not indicate a new building. They cover shower repairs and an electrical service upgrade at the residence.
What work was permitted at 12803 Powderhorn St in 2026?
Building permit 2026-072422 BP and plumbing permit 2026-072422 PP cover shower pan and valve replacement. Both were filed June 8, 2026, and are marked final.
Was there an electrical upgrade at 12803 Powderhorn St?
Yes. Electrical permit 2024-160245 EP, filed December 18, 2024, describes a 200-amp service upgrade and a new 200-amp meter can.
Is 12803 Powderhorn St a new construction project?
The available permit records describe improvements to a residence, not new construction. They list shower replacement and electrical service work.
When was the latest permit filed for 12803 Powderhorn St?
The latest listed permits were filed June 8, 2026, for shower pan and valve replacement. The building and plumbing permits are both marked final.
Also being built nearby
All of 78727- 12805 Powderhorn StJun 12, 2026Install/replace 200 amp main breaker panel and meter can (overhead) · 26 m away
- 12903 Powderhorn StOct 23, 2026Replacement of an existing water heater remove and replace water heater - 40 gal gas located in the garage closet · 67 m away
- 12902 Esplanade StDec 23, 2024Install lawn sprinklers to back yard only · 68 m away
- 2003 Scofield LnFeb 4, 2025Upgrade service to 200amp ug · 69 m away
- 12905 Powderhorn StMar 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical gas system · 92 m away
- 2011 Scofield LnMar 12, 2026Full lawn irrigation install · 103 m away
- 1908 Scofield LnMay 15, 2025Replacement of an existing water heater replace ng water heater · 103 m away
- 1911 Scofield LnNov 6, 2025Installation of 3.01kw solar pv system · 104 m away
- 2004 Abbey CirAug 13, 2026Base: installing a backup battery system and additional meter socket · 141 m away
- 1904 Scofield LnFeb 3, 2026Replacement of complete existing central heat and air system with or without duct work greg walker: replacement of a 3-ton vertical like-for-like gas system · 141 m away
- 12910 Esplanade StMar 7, 2025Replacement of complete existing central heat and air system with or without duct work · 142 m away
- 12912 Esplanade StJan 9, 2025Replacement of an existing water heater · 158 m away