12818 Copper Cliff Ave
Austin, TX 78727
Electrical repair permit at 12818 Copper Cliff Ave
An electrical permit at 12818 Copper Cliff Ave covers repairs and replacement of a Polaris component in a gutter box. The City of Austin issued the permit on December 11, 2025, and its status is final; the record does not describe a new building.
Summarized from City of Austin records · updated Dec 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 11, 2025
- since Dec 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPolaris taps were burnt in the gutter box made repairs and replaced the polaris
- AppliedNov 26, 2025
- IssuedDec 11, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 12, 2025
Passed final inspection Dec 12, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectPolaris taps were burnt in the gutter box made repairs and replaced the polaris
Polaris taps were burnt in the gutter box made repairs and replaced the polaris
City of Austin permitElectrical PermitFinal- Record
- 2025-152062 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12818 Copper Cliff Ave
What is being built at 12818 Copper Cliff Ave?
The City of Austin permit record describes electrical repairs and replacement of a Polaris component in a gutter box, not a new building. Permit 2025-152062 EP was filed December 11, 2025.
What work does permit 2025-152062 EP cover?
The permit description says the Polaris taps were burnt in the gutter box and that repairs and replacement were made. It is an electrical permit.
When was the electrical permit filed for 12818 Copper Cliff Ave?
The City of Austin record lists December 11, 2025, as the filing date for permit 2025-152062 EP.
Is the permit for 12818 Copper Cliff Ave final?
Yes. The City of Austin lists permit 2025-152062 EP as final.
Is a new home being built at 12818 Copper Cliff Ave?
The available permit record documents electrical repairs and replacement of a Polaris component in a gutter box. It does not describe new home construction.
Also being built nearby
All of 78727- 12901 Broughton WayDec 22, 2025Installation of solar panels on existing residential roof. 6.16 kw. addition of 1 0-30a circuits. 14 panels. upgrade electrical service from existing no main breaker/125a to new 125/200a 120/240v single phase. temporary disconnect / reconnect required for installation · 50 m away
- 2202 Cedar Branch DrApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 13001 Broughton WayJun 3, 2026Replacement of complete existing central heat and air system with or without duct work john prado · 96 m away
- 12910 Irongate AveSep 2, 2026Replacing the customers meter and panel · 136 m away
- 12906 Irongate AveMar 6, 2026We will be excavating a 5ft tunnel under the slab to make repairs to the drain line · 137 m away
- 12907 Irongate AveSep 22, 2026Replace main panel with 200-amp feed through panel. add in ground rods and surge protection to meet city of austin codes bring panel up to code. replace existing meter base add in 200-amp ae rated meter base · 157 m away
- 12807 Irongate AveMar 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton gas vertical system · 180 m away
- 12820 Tomanet TrlMay 2, 2024Amnesty co · 190 m away
- 2309 North Shields DrMay 17, 2024Upgrade existing 125 a 120/240 v 1ph under ground service to a 200 a 120/240 v 1ph service. also replacing the breaker panel with the same rating · 192 m away
- 12908 Lamplight Village AveAug 26, 2026Replacement of complete existing central heat and air system with or without duct work full hvac system replacement · 211 m away
- 2311 North Shields DrApr 22, 2024Express: foundation repair · 211 m away
- 12907 Lamplight Village AveApr 2, 20241 access point for tunnel work. the tie in to each fixture will be below grade. the pvc drain lines will be anchored and strapped to the foundation and the drain system will be tested by city inspection. backfill will be done according to the engineers specifications and all debris will be hauled away. cut out and replace approximately 8â of piping under guest bathroom · 224 m away