12832 Withers Way
Austin, TX 78727
12832 Withers Way: 1 project on record
City of Austin lists 1 filing across 1 project at 12832 Withers Way, Austin, TX 78727. The most recent, filed September 17, 2024, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Sep 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2024
- since Sep 17, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedSep 12, 2024
- IssuedSep 17, 2024
- WorkSep '24 – Mar '25
- Final inspectionSep 23, 2024
Passed final inspection Sep 23, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2024-123839 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12832 Withers Way
What is being built at 12832 Withers Way?
The latest filing (City of Austin permit 2024-123839 EP, September 17, 2024) covers install level 2 ev charger.
How many permits and filings does 12832 Withers Way have?
1 filing across 1 project, from September 17, 2024 to September 17, 2024.
Is there other construction near 12832 Withers Way?
Yes. Nearby filings include 12831 Meehan Dr (replacement of an existing water heater, Oct 15, 2024); 12833 Withers Way (replacement of complete existing central heat and air system with or without duct work, Aug 1, 2024); 12816 Withers Way (replacement of an existing water heater, Jul 6, 2024).
How do I get alerts for new permits at 12832 Withers Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 12831 Meehan DrOct 15, 2024Replacement of an existing water heater · 52 m away
- 12833 Withers WayAug 1, 2024Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 12816 Withers WayJul 6, 2024Replacement of an existing water heater · 65 m away
- 12903 Meehan DrFeb 13, 2025Replacement of an existing water heater · 79 m away
- 12823 Meehan DrJul 22, 2025Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 1712 Hackney CvJun 7, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal two stage gas · 91 m away
- 12808 Withers WayNov 21, 2024Replace water heater like for like to residence · 97 m away
- 12821 Meehan DrOct 17, 2024Express: windows interior doors repairs walls light fixtures water heater electrical service replacement new hvac units only tub to shower conversion · 104 m away
- 12819 Meehan DrAug 26, 2025Repair roof sheathing - approximately 250 sq ft repair/replace drywall - moisture/other damage - approximately 250sf bathroom - tub/shower surround remodel in 2 bathrooms - approximately 180 sq ft · 118 m away
- 12809 Withers WayMar 26, 2025Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 12807 Widge DrSep 28, 2026Upgrade main service to 200 amps new meter can main breaker panel grounding. ae scheduled outage required install hardwired electric vehicle charger 60-amp circuit ae rebate · 134 m away
- 12805 Withers WayDec 15, 2025Express- remove and replace 7 windows: like for like no structural changes · 134 m away