12905 Lamplight Village Ave
Austin, TX 78727
12905 Lamplight Village Ave: 4 projects on record
City of Austin lists 4 filings across 4 projects at 12905 Lamplight Village Ave, Austin, TX 78727 since August 21, 2024. The most recent, filed March 24, 2025, covers: “Interior remodel/ garage conversion of sfr”.
Compiled from City of Austin records · updated Mar 24, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Mar 24, 2025
- since Aug 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInterior remodel/ garage conversion of sfr
- AppliedJun 25, 2024
- IssuedMar 24, 2025
- WorkMar '25 – Sep '25
- Final inspectionSep 11, 2025
Passed final inspection Sep 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
4 projectsInterior remodel/ garage conversion of sfr
Interior remodel/ garage conversion of sfr
City of Austin permitMechanical PermitFinal- Record
- 2024-102513 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel/ garage conversion of sfr service upgrade
Interior remodel/ garage conversion of sfr service upgrade
City of Austin permitElectrical PermitFinal- Record
- 2024-102513 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel/ garage conversion of sfr
Interior remodel/ garage conversion of sfr
City of Austin permitPlumbing PermitFinal- Record
- 2024-102513 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel/ garage conversion of sfr
Interior remodel/ garage conversion of sfr
City of Austin permitBuilding PermitFinal- Record
- 2024-102513 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12905 Lamplight Village Ave
What is being built at 12905 Lamplight Village Ave?
The latest filing (City of Austin permit 2024-102513 MP, March 24, 2025) covers interior remodel/ garage conversion of sfr.
How many permits and filings does 12905 Lamplight Village Ave have?
4 filings across 4 projects, from August 21, 2024 to March 24, 2025.
Is there other construction near 12905 Lamplight Village Ave?
Yes. Nearby filings include 12907 Lamplight Village Ave (1 access point for tunnel work. the tie in to each fixture will be below grade. the pvc drain lines will be anchored and strapped to the foundation and the drain system will be tested by city inspection. backfill will be done according to the engineers specifications and all debris will be hauled away. cut out and replace approximately 8â of piping under guest bathroom, Apr 2, 2024); 12908 Lamplight Village Ave (replacement of complete existing central heat and air system with or without duct work full hvac system replacement, Aug 26, 2026); 12901 Lamplight Village Ave (express- foundation repair, Feb 2, 2026).
How do I get alerts for new permits at 12905 Lamplight Village Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 12907 Lamplight Village AveApr 2, 20241 access point for tunnel work. the tie in to each fixture will be below grade. the pvc drain lines will be anchored and strapped to the foundation and the drain system will be tested by city inspection. backfill will be done according to the engineers specifications and all debris will be hauled away. cut out and replace approximately 8â of piping under guest bathroom · 4 m away
- 12908 Lamplight Village AveAug 26, 2026Replacement of complete existing central heat and air system with or without duct work full hvac system replacement · 13 m away
- 12901 Lamplight Village AveFeb 2, 2026Express- foundation repair · 16 m away
- 12912 Candlestick PlOct 6, 2026100/125amp panel 200 amp meter base grounding and bonding · 55 m away
- 12907 Irongate AveSep 22, 2026Replace main panel with 200-amp feed through panel. add in ground rods and surge protection to meet city of austin codes bring panel up to code. replace existing meter base add in 200-amp ae rated meter base · 68 m away
- 2100 Scofield LnOct 3, 2025Express: replace 1 window like for like · 94 m away
- 12910 Irongate AveSep 2, 2026Replacing the customers meter and panel · 113 m away
- 12906 Irongate AveMar 6, 2026We will be excavating a 5ft tunnel under the slab to make repairs to the drain line · 117 m away
- 13000 Candlestick PlOct 12, 2026Replacement of complete existing central heat and air system with or without duct work · 126 m away
- 12807 Irongate AveMar 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton gas vertical system · 138 m away
- 12806 Lamppost LnJun 5, 2024Add power for tankless water heater · 140 m away
- 13001 Candlestick PlMar 19, 2024Replacement of complete existing central heat and air system with or without duct work · 154 m away