12921 Meehan Dr
Austin, TX 78727
12921 Meehan Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 12921 Meehan Dr, Austin, TX 78727 since May 23, 2025. The most recent, filed August 6, 2025, covers: “Replace interior panel”.
Compiled from City of Austin records · updated Aug 6, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 6, 2025
- since May 23, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace interior panel
- AppliedAug 5, 2025
- IssuedAug 6, 2025
- WorkAug '25 – Sep '25
- Final inspectionSep 3, 2025
Passed final inspection Sep 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplace interior panel
Replace interior panel
City of Austin permitElectrical PermitFinal- Record
- 2025-098721 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace failing electric meter enclosure - service upgrade - replacing electrical panel and meter
Replace failing electric meter enclosure - service upgrade - replacing electrical panel and meter
City of Austin permitElectrical PermitFinal- Record
- 2023-088850 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12921 Meehan Dr
What is being built at 12921 Meehan Dr?
The latest filing (City of Austin permit 2025-098721 EP, August 6, 2025) covers replace interior panel.
How many permits and filings does 12921 Meehan Dr have?
2 filings across 2 projects, from May 23, 2025 to August 6, 2025.
Is there other construction near 12921 Meehan Dr?
Yes. Nearby filings include 12917 Meehan Dr (replacement of complete existing central heat and air system with or without duct work, Oct 27, 2025); 13000 Meehan Dr (replacement of an existing water heater, Jan 25, 2024); 1709 Ender Cv (replacement of an existing water heater, May 27, 2025).
How do I get alerts for new permits at 12921 Meehan Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 12917 Meehan DrOct 27, 2025Replacement of complete existing central heat and air system with or without duct work · 37 m away
- 13000 Meehan DrJan 25, 2024Replacement of an existing water heater · 45 m away
- 1709 Ender CvMay 27, 2025Replacement of an existing water heater · 63 m away
- 1705 Ender CvDec 18, 2025Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 12913 Widge DrApr 7, 2025Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 1700 Quarter Boot CvAug 19, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 95 m away
- 1712 Hackney CvJun 7, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal two stage gas · 98 m away
- 1704 Ender CvSep 18, 2025Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 13007 Staton DrAug 17, 2026Main panel changeout · 119 m away
- 12924 Widge DrJul 1, 2024Replacement of an existing water heater · 120 m away
- 12903 Meehan DrFeb 13, 2025Replacement of an existing water heater · 124 m away
- 12920 Widge DrSep 3, 2026Scaife - 40-09000 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 200 amp main breaker. upgrading revenue meter to 200 amps. underground service requesting wire pull · 125 m away