Water line replacement permitted at 13122 Bayfield Dr
An Austin permit covers replacing about 30 feet of the existing underground water line at the home, from the water meter to the exterior connection point. The plumbing permit was filed on November 11, 2026, and is listed as active.
Summarized from City of Austin records · updated Nov 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2026
- since Nov 11, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplace approximately 30 feet of the existing underground water yard line extending from the water meter to the exterior connection point of the home
- AppliedNov 6, 2026
- IssuedNov 11, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace approximately 30 feet of the existing underground water yard line extending from the water meter to the exterior connection point of the home
Replace approximately 30 feet of the existing underground water yard line extending from the water meter to the exterior connection point of the home
City of Austin permitPlumbing PermitActive- Record
- 2026-146992 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 13122 Bayfield Dr
What is being built at 13122 Bayfield Dr?
The permit covers replacement of about 30 feet of the home's existing underground water line, not a new building. Austin permit 2026-146992 PP was filed November 11, 2026.
Is there a new construction project at 13122 Bayfield Dr?
The available record is for plumbing work at an existing home: replacing an underground water line between the meter and the home's exterior connection point.
When was the water line permit filed?
Austin filed plumbing permit 2026-146992 PP on November 11, 2026. Its listed status is active.
How much of the water line is being replaced?
The permit describes replacing approximately 30 feet of existing underground water yard line.
Where does the water line work extend?
The permitted work extends from the water meter to the exterior connection point of the home at 13122 Bayfield Dr.
Also being built nearby
All of 78727- 13118 Bayfield DrApr 2, 2025Replacement of an existing water heater 50gal gas water heater and prv replacement · 19 m away
- 13130 Bayfield DrAug 10, 2026Demolition old driveway. construct new driveway approach of 16.3 ft and sidewalk of 10 lf · 38 m away
- 13117 Bayfield DrNov 18, 2025Install roof mounted solar pv system · 48 m away
- 13129 Bayfield DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 66 m away
- 13137 Bayfield DrMar 18, 2025Solar system addition · 84 m away
- 1427 Tamar LnNov 5, 2024Express: existing foundation repair as per scope of work attached · 87 m away
- 1415 Tamar LnApr 25, 2025Excavate 15 tunnel to repair main drain line under house serving one bathroom · 88 m away
- 1431 Tamar LnMar 17, 2026Express: foundation repair · 91 m away
- 13142 Bayfield DrAug 17, 2026Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 1405 Tamar LnNov 12, 2026Base: installing a backup battery system and additional meter socket · 107 m away
- 13146 Bayfield DrSep 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas downstairs system · 116 m away
- 13017 Scofield Farms DrAug 25, 2026Miller - 40-06155 - disconnect/reconnect power to tie in pv component and upgrading revenue meter to 200 amps. 150 amp main breaker. upgrading revenue meter to 200 amps. underground service requesting wire pull · 128 m away