Rooftop solar and EV charging circuit permitted at Austin home
City of Austin permits indicate an 8.075 kW rooftop solar system was installed at the existing residence on May 13, 2025. A separate permit filed August 11, 2026, covers an electrical circuit for an electric vehicle charging station. Both permits are listed as final.
Summarized from City of Austin records · updated Aug 11, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 11, 2026
- since May 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled(becker nicholas treehouse) - installation of circuit for elec. vehicle charging station - esip
- AppliedAug 6, 2026
- IssuedAug 11, 2026
- WorkAug '26 – Feb '27
- Final inspectionAug 20, 2026
Passed final inspection Aug 20, 2026.
1 contact on this project
Permit & project history
2 projects(becker nicholas treehouse) - installation of circuit for elec. vehicle charging station - esip
(becker nicholas treehouse) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2026-102412 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 8.075 kw rooftop solar system for existing residential only
Install new 8.075 kw rooftop solar system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-056261 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 13308 Kirkglen Dr
What is being installed at 13308 Kirkglen Dr?
City of Austin records show an 8.075 kW rooftop solar system and a circuit for an electric vehicle charging station at the existing residence.
Was a solar system permitted at 13308 Kirkglen Dr in Austin?
Yes. Permit 2025-056261 EP, filed May 13, 2025, covers installation of an 8.075 kW rooftop solar system for an existing residence. Its status is listed as final.
Is there an EV charger permit for 13308 Kirkglen Dr?
Permit 2026-102412 EP, filed August 11, 2026, covers installation of a circuit for an electric vehicle charging station. The permit is listed as final.
When were the permits filed for work at 13308 Kirkglen Dr?
The solar permit was filed May 13, 2025, and the electric vehicle charging circuit permit was filed August 11, 2026.
Is 13308 Kirkglen Dr a new home construction project?
The records describe work at an existing residence: a rooftop solar system and an electrical circuit for an electric vehicle charging station. They do not describe new home construction.
Also being built nearby
All of 78727- 13312 Kirkglen DrApr 18, 2024Hardwire a chargepoint flex charger next to panel with #6 wire and 50a breaker · 23 m away
- 1504 Chasewood DrDec 11, 2024Replacement of complete existing central heat and air system with or without duct work · 31 m away
- 13309 Chasewood CvMar 25, 2026Exterior water line spot repair we will attempt to replace the existing prv with a new prv regulator however if the connections are not in good condition we will have to replace the homeowner shutoff valve meter nipple and fittings to main water line · 40 m away
- 13317 Chasewood CvNov 9, 2026Replacement of complete existing central heat and air system with or without duct work downstairs · 82 m away
- 1505 Chasewood DrJun 3, 2026Express: repairs due to fire damage · 85 m away
- 1509 Chasewood DrJun 1, 2026Express: repairs due to fire damage · 88 m away
- 13312 Chasewood CvMay 8, 2026Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 1608 Chasewood DrNov 24, 2025Express: replace 15 windows like for like · 122 m away
- 1605 Chasewood DrOct 10, 2025Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 13208 Kincaid CtJun 18, 2024Ev charger installed into residential garage · 132 m away
- 13313 Bosswood DrJun 28, 2024Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 13305 Bosswood DrFeb 20, 2024Replacement of an existing water heater · 164 m away
More solar installs in 78727.