1729 Dapplegrey Ln
Austin, TX 78727
Vehicle-to-home charging system permitted at Austin home
A vehicle-to-home (V2H) charging system is being installed at this Austin home under an electrical permit dated July 31, 2026. The permit describes a bidirectional charger and home hub connected to selected backed-up electrical loads. Earlier permits cover an electrical panel upgrade in May 2025 and an EV charger in December 2023.
Summarized from City of Austin records · updated Jul 31, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 31, 2026
- since Dec 21, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of gm energy v2h (vehicle-to-home) charging system. per guidance from stuart prior at ae we need to submit this interconnection application with inspection from ae under an aux power electrical permit because the hardware involves a ul 1741 grid-interactive device. ae wants to test the v2h functionality at final inspection to ensure effective isolation from the grid. gm energy home hub to be powered by 125a breaker placed in existing main electric panel. gm energy powershift bidirectional charger to be hardwired to a 60a breaker placed in home hub. designated backed-up loads for v2h during grid outage: 50a subpanel. all other loads will be non-backed-up
- AppliedJun 16, 2026
- IssuedJul 31, 2026
- WorkJul '26 – Jan '27
- Final inspectionSep 18, 2026
Passed final inspection Sep 18, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsInstallation of gm energy v2h (vehicle-to-home) charging system. per guidance from stuart prior at ae we need to submit this interconnection application with inspection from ae under an aux power electrical permit because the hardware involves a ul 1741 grid-interactive device. ae wants to test the v2h functionality at final inspection to ensure effective isolation from the grid. gm energy home hub to be powered by 125a breaker placed in existing main electric panel. gm energy powershift bidirectional charger to be hardwired to a 60a breaker placed in home hub. designated backed-up loads for v2h during grid outage: 50a subpanel. all other loads will be non-backed-up
Installation of gm energy v2h (vehicle-to-home) charging system. per guidance from stuart prior at ae we need to submit this interconnection application with inspection from ae under an aux power electrical permit because the hardware involves a ul 1741 grid-interactive device. ae wants to test the v2h functionality at final inspection to ensure effective isolation from the grid. gm energy home hub to be powered by 125a breaker placed in existing main electric panel. gm energy powershift bidirectional charger to be hardwired to a 60a breaker placed in home hub. designated backed-up loads for v2h during grid outage: 50a subpanel. all other loads will be non-backed-up
City of Austin permitElectrical PermitFinal- Record
- 2026-077141 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Electrical upgrade- new electrical panel with main breaker
Electrical upgrade- new electrical panel with main breaker
City of Austin permitElectrical PermitFinal- Record
- 2025-055235 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of an ev charger
Installation of an ev charger
City of Austin permitElectrical PermitFinal- Record
- 2023-162260 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1729 Dapplegrey Ln
What is being installed at 1729 Dapplegrey Ln?
City of Austin permit records describe a vehicle-to-home charging system, including a bidirectional charger and home hub. The July 31, 2026 permit is 2026-077141 EP.
What does the vehicle-to-home system do?
The permit describes a system intended to power designated backed-up loads during a grid outage. It also says the system will be tested at final inspection to check isolation from the grid.
When was the V2H system permitted at 1729 Dapplegrey Ln?
The City of Austin issued electrical permit 2026-077141 EP on July 31, 2026. Its status is listed as Final.
Was an EV charger already permitted at this address?
Yes. A City of Austin permit dated December 21, 2023, describes installation of an EV charger. The permit number is 2023-162260 EP.
Was the electrical panel upgraded at 1729 Dapplegrey Ln?
A May 9, 2025 City of Austin permit describes a new electrical panel with a main breaker. The permit number is 2025-055235 EP.
Also being built nearby
All of 78727- 1732 Dapplegrey LnAug 23, 2024Replacement of complete existing central heat and air system with or without duct work · 42 m away
- 1716 Dapplegrey LnDec 27, 2024Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 1736 Dapplegrey LnSep 20, 2024Express: window replacement (20 windows like for like) · 52 m away
- 12604 Picket Rope LnApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 1745 Dapplegrey LnNov 15, 2023Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 1812 Dapplegrey LnMay 8, 2024Request to disconnect replace rodent damaged load side conductors · 80 m away
- 12601 Picket Rope LnMar 18, 2025Foundation repair on the existing single family residence · 87 m away
- 12605 Picket Rope LnMar 2, 2007Scofield phase vi, section 1 drainage improvements · 89 m away
- 1749 Dapplegrey LnApr 11, 2024Replacement of complete existing central heat and air system with or without duct work · 90 m away
- 1705 Dapplegrey LnMar 4, 2025Excavate roughly 13 feet starting at the outside clean out to expose faulty/damaged pipe. once exposed all faulty pipe will be cut out and replaced using schedule 40 pvc. hang all new pipe per code using clevis hangers · 101 m away
- 12555-1/2 Metric BlvdJan 21, 2022Verizon wireless - metric · 102 m away
- 1821 Dapplegrey LnNov 13, 2025Express - removing and replacing 4 windows 1 exterior door · 119 m away