1900 Scofield Ln
Austin, TX 78727
1900 Scofield Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1900 Scofield Ln, Austin, TX 78727. The most recent, filed August 20, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 20, 2024
- since Aug 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 5, 2018
- IssuedAug 20, 2024
- !WorkAug '24 – Feb '25
- Final inspection
Marked expired Feb 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2018-191165 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1900 Scofield Ln
What is being built at 1900 Scofield Ln?
The latest filing (City of Austin permit 2018-191165 MP, August 20, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1900 Scofield Ln have?
1 filing across 1 project, from August 20, 2024 to August 20, 2024.
Is there other construction near 1900 Scofield Ln?
Yes. Nearby filings include 1902 Scofield Ln (we performed an emergency electrical service rebuild at 907 scofield lane. the original panelboard did not have a main breaker and a portion of the busbar had become so damaged that the meter was removed via austin energy to de-energize. customer was out of power for 4 days when we were called to assist. a new panel with a main breaker was installed, Sep 13, 2024); 1904 Scofield Ln (replacement of complete existing central heat and air system with or without duct work greg walker: replacement of a 3-ton vertical like-for-like gas system, Feb 3, 2026); 12803 Rampart St (perform gas pressure test and repair existing gas line leak in attic; no structural change, Apr 14, 2026).
How do I get alerts for new permits at 1900 Scofield Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 1902 Scofield LnSep 13, 2024We performed an emergency electrical service rebuild at 907 scofield lane. the original panelboard did not have a main breaker and a portion of the busbar had become so damaged that the meter was removed via austin energy to de-energize. customer was out of power for 4 days when we were called to assist. a new panel with a main breaker was installed · 16 m away
- 1904 Scofield LnFeb 3, 2026Replacement of complete existing central heat and air system with or without duct work greg walker: replacement of a 3-ton vertical like-for-like gas system · 39 m away
- 12803 Rampart StApr 14, 2026Perform gas pressure test and repair existing gas line leak in attic; no structural change · 52 m away
- 12801 Rampart StMay 7, 2025Emergency job*install/replace 150 amp main breaker panel and meter (overhead) ***emergency inspection done on 5/4/25. espa required-hyatt · 53 m away
- 12807 Rampart StJun 24, 2026Residential upgrade per ec this permit request is for a main electrical service panel upgrade due to the existing panel being outdated and no longer meeting current standards · 73 m away
- 1908 Scofield LnMay 15, 2025Replacement of an existing water heater replace ng water heater · 78 m away
- 12808 Rampart StNov 21, 2023Express: window replacement (like for like) · 95 m away
- 12713 Rampart StApr 4, 2025No load change. relocating main electrical service including meter socket and main electrical panel around the corner to the left/rear northeast corner of the house on the brick wall approximately 5 feet towards the front of the house from the back wall to allow for siding repairs by others and raising point of attachment to through-roof mast. me · 101 m away
- 1906 Metairie CirApr 17, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system · 103 m away
- 12811 Rampart StOct 23, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton vertical gas system · 106 m away
- 1911 Scofield LnNov 6, 2025Installation of 3.01kw solar pv system · 112 m away
- 1907 Metairie CirApr 4, 2024Replacement of complete existing central heat and air system with or without duct work · 146 m away