2009 Magazine St
Austin, TX 78727
2009 Magazine St permit adds a Level 2 EV charger
A residential electrical upgrade and Level 2 EV charger installation were permitted at 2009 Magazine St on August 3, 2026. Permit 2026-098049 EP covers a new 200-amp service, meter and main panel; its status is Final.
Summarized from City of Austin records · updated Aug 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 3, 2026
- since Aug 3, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade electrical service to 200a including new 200a revenue meter and new 200a main electric panel with 200a main breaker. includes installation of a level 2 ev charger to be powered from new main electric panel. overhead service
- AppliedJul 29, 2026
- IssuedAug 3, 2026
- WorkAug '26 – Sep '26
- Final inspectionSep 17, 2026
Passed final inspection Sep 17, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade electrical service to 200a including new 200a revenue meter and new 200a main electric panel with 200a main breaker. includes installation of a level 2 ev charger to be powered from new main electric panel. overhead service
Upgrade electrical service to 200a including new 200a revenue meter and new 200a main electric panel with 200a main breaker. includes installation of a level 2 ev charger to be powered from new main electric panel. overhead service
City of Austin permitElectrical PermitFinal- Record
- 2026-098049 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2009 Magazine St
What work is permitted at 2009 Magazine St in Austin?
City of Austin permit 2026-098049 EP covers an electrical service upgrade to 200 amps and installation of a Level 2 EV charger. It was filed August 3, 2026.
Is a Level 2 EV charger being installed at 2009 Magazine St?
Yes. The August 3, 2026 permit includes a Level 2 EV charger powered from the new main electrical panel.
Is the electrical service being upgraded at 2009 Magazine St?
Yes. The permit describes a new 200-amp revenue meter and a new 200-amp main panel with a 200-amp main breaker.
What is the status of permit 2026-098049 EP?
The City of Austin permit record lists its status as Final.
How much will the electrical work at 2009 Magazine St cost?
The permit record does not list a reported valuation or project cost.
Also being built nearby
All of 78727- 13205 Elysian Fields CvMay 30, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 3 ton single stage goodman system · 50 m away
- 13203 Elysian Fields CvMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 75 m away
- 13205 Bourbon StAug 25, 2025Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 13201 Elysian Fields CvJun 26, 2025Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 13201 Bourbon StJun 10, 2024Replacing 200 amp service · 114 m away
- 13347 Kinder PassMay 14, 2024Riley - install new _8.7__kw rooftop solar system to existing residential only using backfed breaker · 117 m away
- 13107 Elysian Fields CvMay 28, 2024Replacement of complete existing central heat and air system with or without duct work · 116 m away
- 13343 Kinder PassNov 20, 2023Express: window replacement (like for like) · 126 m away
- 13105 Bourbon StFeb 19, 2024Express: replace windows · 133 m away
- 13200 Bourbon StJul 1, 2024Express: tub to walk-in-shower no plumbing moving no change to layout · 135 m away
- 13105 Elysian Fields CvAug 12, 2026Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 13409 Kinder PassJul 22, 2025Replacement of an existing water heater navien water heater 13409 kinder pass austin tx 78727 · 146 m away