2102 Red Stone Ln
Austin, TX 78727
2102 Red Stone Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 2102 Red Stone Ln, Austin, TX 78727. The most recent, filed April 4, 2024, covers: “Replace shower valve”.
Compiled from City of Austin records · updated Apr 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 4, 2024
- since Apr 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace shower valve
- AppliedMar 27, 2024
- IssuedApr 4, 2024
- WorkApr '24 – Apr '24
- Final inspectionApr 15, 2024
Passed final inspection Apr 15, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace shower valve
Replace shower valve
City of Austin permitPlumbing PermitFinal- Record
- 2024-038277 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2102 Red Stone Ln
What is being built at 2102 Red Stone Ln?
The latest filing (City of Austin permit 2024-038277 PP, April 4, 2024) covers replace shower valve.
How many permits and filings does 2102 Red Stone Ln have?
1 filing across 1 project, from April 4, 2024 to April 4, 2024.
Is there other construction near 2102 Red Stone Ln?
Yes. Nearby filings include 2100 Red Stone Ln (replacement of complete existing central heat and air system with or without duct work, Jul 18, 2024); 2103 Lampwick Cir (replacement of complete existing central heat and air system with or without duct work replacing existing hvac. 80% furnace coil and condenser. leaving all ductwork. like for like change-out, Sep 26, 2025); 2103 Red Stone Ln (upgrade existing 125a service to 150a, Jun 2, 2025).
How do I get alerts for new permits at 2102 Red Stone Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 2100 Red Stone LnJul 18, 2024Replacement of complete existing central heat and air system with or without duct work · 21 m away
- 2103 Lampwick CirSep 26, 2025Replacement of complete existing central heat and air system with or without duct work replacing existing hvac. 80% furnace coil and condenser. leaving all ductwork. like for like change-out · 36 m away
- 2103 Red Stone LnJun 2, 2025Upgrade existing 125a service to 150a · 48 m away
- 2102 Lampwick CirJan 14, 2025Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 2100 Brandywine LnOct 8, 2025Tub to shower replacement in the same footprint and not moving plumbing · 99 m away
- 12503 Brandywine CtApr 3, 2026Tunnel to repair separated sewer line under home. tunnel access will be located in front of home. there will also be a 20 trench to replace main building sewer line from home to city tap · 108 m away
- 12519 Lamplight Village AveAug 11, 2025Upgrade service replace interior panel replace indoor receptacles relocate one exisisting recceptacle add 2 new receptacles in garage add one gfci receptacle in bathroom add one light fixture garage area replace several exterior light fixtures · 123 m away
- 2107 Cindy LnJul 28, 2026Relocate water heater · 127 m away
- 12600 Lamppost LnMay 15, 2024Replacement of an existing water heater · 129 m away
- 12515 Lamplight Village AveOct 29, 2025Replacement of an existing water heater · 137 m away
- 12610 Lamppost LnNov 4, 2026Express: foundation repair revision-plumbing work (tunneling underneath home to repair sewer line) · 141 m away
- 12515 Limerick AveMay 4, 2026Run conduit approximately 40ft on left side of house from main panel to garage for nema 14-50r installed in the garage for car charger · 152 m away