2600 Century Park Blvd
Austin, TX 78727
2600 Century Park Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 2600 Century Park Blvd, Austin, TX 78727. The most recent, filed March 2, 2007, covers: “Woods of century park condominiums; the”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2600 Century Park Blvd
What is being built at 2600 Century Park Blvd?
The latest filing (City of Austin case 202986, March 2, 2007) covers woods of century park condominiums; the.
How many permits and filings does 2600 Century Park Blvd have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 2600 Century Park Blvd?
Yes. Nearby filings include 2601 Century Park Blvd (replacement of an existing water heater, Feb 11, 2025); 13525 Shawna Dnay Dr (replacement of an existing water heater new water heater change out 13525 shawna dnay drive austin tx 78727, Jun 17, 2026); 2616 Century Park Blvd (10ft tunnel under slab to repair broken drain line, Jun 13, 2025).
How do I get alerts for new permits at 2600 Century Park Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 2601 Century Park BlvdFeb 11, 2025Replacement of an existing water heater · 43 m away
- 13525 Shawna Dnay DrJun 17, 2026Replacement of an existing water heater new water heater change out 13525 shawna dnay drive austin tx 78727 · 53 m away
- 2616 Century Park BlvdJun 13, 202510ft tunnel under slab to repair broken drain line · 74 m away
- 2500 Century Park BlvdMay 1, 2026Replacement of an existing water heater replacement of gas water heater like for like · 77 m away
- 2613 Century Park BlvdSep 11, 2025Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 13524 Ryan Matthew DrSep 17, 2026Express: foundation repair (32 exterior pilings) · 83 m away
- 2604 Briana Shay DrJul 3, 2025Install evse · 88 m away
- 13517 Shawna Dnay DrJun 3, 2025Express: re build after fire loss · 89 m away
- 2608 Briana Shay DrMay 28, 2026Express: foundation repair · 96 m away
- 2612 Briana Shay DrOct 22, 2026We will excavate 1 access hole and tunnel approximately 5 feet under the slab to repair the main line [approx. 45 ft] · 107 m away
- 13516 Ryan Matthew DrAug 13, 2026Express: foundation repair · 109 m away
- 2621 Century Park BlvdApr 10, 2024Replacement of an existing water heater · 114 m away