2621 Briana Shay Dr
Austin, TX 78727
2621 Briana Shay Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2621 Briana Shay Dr, Austin, TX 78727. The most recent, filed April 3, 2025, covers: “Repipe of entire water system”.
Compiled from City of Austin records · updated Apr 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 3, 2025
- since Apr 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepipe of entire water system
- AppliedMar 18, 2025
- IssuedApr 3, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 24, 2025
Passed final inspection Apr 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectRepipe of entire water system
Repipe of entire water system
City of Austin permitPlumbing PermitFinal- Record
- 2025-032455 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2621 Briana Shay Dr
What is being built at 2621 Briana Shay Dr?
The latest filing (City of Austin permit 2025-032455 PP, April 3, 2025) covers repipe of entire water system.
How many permits and filings does 2621 Briana Shay Dr have?
1 filing across 1 project, from April 3, 2025 to April 3, 2025.
Is there other construction near 2621 Briana Shay Dr?
Yes. Nearby filings include 2613 Briana Shay Dr (replacement of complete existing central heat and air system with or without duct work, Aug 19, 2025); 2612 Briana Shay Dr (we will excavate 1 access hole and tunnel approximately 5 feet under the slab to repair the main line [approx. 45 ft], Oct 22, 2026); 2609 Briana Shay Dr (replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal gas, Aug 15, 2026).
How do I get alerts for new permits at 2621 Briana Shay Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 2613 Briana Shay DrAug 19, 2025Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 2612 Briana Shay DrOct 22, 2026We will excavate 1 access hole and tunnel approximately 5 feet under the slab to repair the main line [approx. 45 ft] · 53 m away
- 2609 Briana Shay DrAug 15, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton horizontal gas · 54 m away
- 13516 William Kennedy DrNov 18, 2026Express: foundation repair - installing 10 push piers · 61 m away
- 2608 Briana Shay DrMay 28, 2026Express: foundation repair · 68 m away
- 2621 Century Park BlvdApr 10, 2024Replacement of an existing water heater · 80 m away
- 2604 Briana Shay DrJul 3, 2025Install evse · 81 m away
- 2625 Lou John StJan 27, 2025Express: replacing 7 windows (like for like) · 83 m away
- 13528 William Kennedy DrMay 1, 2024(yu martin) - installation of circuit for elec. vehicle charging station - esip · 84 m away
- 2613 Century Park BlvdSep 11, 2025Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 2601 Century Park BlvdFeb 11, 2025Replacement of an existing water heater · 122 m away
- 2616 Century Park BlvdJun 13, 202510ft tunnel under slab to repair broken drain line · 125 m away